Advertisement

E.
Pass the neutral switch lead
over the lower engine guard
stay.
F.
Fasten the neutral switch lead
and radiator breather hose to
the frame.
G.
Fasten the neutral switch lead,
CDI magneto lead and radiator
breather hose to the frame.
H.
Fasten the neutral switch lead,
CDI magneto lead, radiator
breather hose and clutch cable
to the frame over the radiator
mounting boss.
I.
Pass the radiator breather hose
in front of the radiator hose 2, on
the left of the chassis, and then
between the frame and radiator
hose 4.
J.
Fasten the sub-wire harness,
engine stop switch lead and
ground lead to the CDI unit
bracket at the position-taped
portion of the sub-wire harness
and with the clamp ends facing
downward.
K.
Fasten the ground lead and ca-
ble guide together to the CDI
unit bracket.
L.
Locate the clamp ends under
the throttle cable, and after
clamping, leave the other end as
is and do not cut it. [clamp:L=
270mm (10.6 in)]
M.
Fasten the neutral switch lead
and CDI magneto lead to the
frame over its hump.
N.
Fasten the throttle position sen-
sor lead and the hot starter ca-
ble.
O.
Locate the clamp between the
hot starter cable protector and
rubber cap.
CABLE ROUTING DIAGRAM
2-21

Advertisement

Comments to this Manuals

Symbols: 0
Latest comments:
  • nick Jan 26, 2016 10:47:
    The download is jacked up, so it's only really viewable on the site, but can't really complain since it's free.