Sharp DV-NC70U Service Manual page 20

Vcr/dvd combination model
Table of Contents

Advertisement

DV-NC70U/C
DV-NC72U
2. Mechanical initial setting
• Rotate the worm gear by pushing the flange manually
until return to initial position.
• When apply power supply to rotate the loading motor,
please remove/unsolder at least one terminal wire.
• If voltage applied to loading motor without disconnecting
the terminal wire, there is a possibility the capstan motor
IC will damage.
INSTALLING THE MECHANISM ON PWB
Lower vertically the mechanism, paying attention to the
mechanism edge mode SW position, (Set the mode SW
position to 270 and make sure the master cam position
hole also in 270 position) and install the mechanism with
due care so that the parts are not damaged.
* Please make sure to insert correctly.
If not, strange moving will occur and will couse mecha-
nism damage.
• The maximum applied voltage is 9V. If more than 9V,
there is a possibility the mechanism will damage.
• After ascertaining the return to the initial set position
install the cassette housing in the specified position. (This
method is applied only for the mechanism.)
Rotate the flange of worm gear by using thin stick.
CW ---- Loading direction
CCW -- Ejection direction
Note
Be careful not to damage the gear of worm gear
and worm wheel gear. It might cause a strange sound.
PARTS WHICH NEED PARTICULAR CARE
When installing the mechanism chassis on the PWB unit,
take care so as to prevent deformation due to contact of
mechanism chassis with REC Tip SW.
MODE SW
Master Cam Position
180
This positioning hole
should be at frontside.
20
Start Sensor
90
0
This pin should be
at frontside.
270

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dv-nc70cDv-nc72u

Table of Contents