Canon CLC 1120 Service Manual page 544

Color laser copier
Hide thumbs Also See for CLC 1120:
Table of Contents

Advertisement

5) Secure the drum shaft positioning tool [7]
in place to the photosensitive drum frame
unit with the two screws [8] removed in
step 2).
6) Secure the drum motor assembly in place
with seven screws.
7) Detach the drum shaft positioning tool,
and slide out the photosensitive drum unit
from the copier; then, mount the unit and
parts removed in step 1).
3
Use of Grease
Do NOT use grease (conducting or
otherwise) to the slip ring for the drum heater.
Adjusting the Developing
4
Assembly S-B Gap
If you have replaced the developing blade,
adjust the S-B gap of each sleeve using the S-
B gap gauge (FY9-3044-000).
COPYRIGHT © 1999 CANON INC.
CANON CLC1120/1130/1150 REV.0 MAR. 1999 PRINTED IN JAPAN (IMPRIME AU JAPON)
CHAPTER 13 TROUBLESHOOTING
[8]
Figure 13-220
Developer
Yellow
0.62 mm
Cyan
0.74 mm
Magenta
0.74 mm
Black
0.48 mm
Table 13-201
[7]
S-B gap
13-17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Clc 1130Clc 1150

Table of Contents