Installing The Line Cord Anchor (For Rack Mounted Servers); Two Cell Server Installation (Rp7410, Rp7420, Rp7440, Rx7620, Rx7640); Distribution Of Input Power For Each Bulk Power Supply - HP rp7440 Installation Manual

Installation guide, fourth edition - hp integrity rx7640 and hp 9000 rp7440 servers
Hide thumbs Also See for rp7440:
Table of Contents

Advertisement

The current power grid configuration is: Single gridPower grid configuration preference.
1. Single grid2. Dual grid
Select Option:
Figure 2-26 Distribution of Input Power for Each Bulk Power Supply
WARNING!
is connected. This voltage is present even when the main power switch is in the off position. To
completely remove power, all power cords must be removed from the server. Failure to observe
this warning could result in personal injury or damage to equipment.
CAUTION:
Do not route data and power cables in parallel paths in close proximity to each other. The
suggested minimum distance between the data and power cables is 3 inches (7.62 cm).
The power cord has current flowing through it, which creates a magnetic field. The potential to
induce electromagnetic interference in the data cables exists, which can cause data corruption.
NOTE:
Label the AC power cords during the installation. One suggestion is to use tie wraps
that have the flag molded into the tie wrap. The flag can be labeled using the appropriate two
characters to represent the particular AC power input (for example, A0). Another suggestion
would be to use color coded plastic bands. Use one color to represent the first pair A0/A1 and
another color to represent the second pair B0/B1 (provided a second power source is available
at the customer site).
NOTE:
System firmware will prevent boot when a single power cord configuration is detected.

Installing The Line Cord Anchor (for rack mounted servers)

The line cord anchor is attached to the rear of the server when rack mounted. It provides a method
to secure the line cords to the server preventing accidental removal of the cords from the server.

Two Cell Server Installation (rp7410, rp7420, rp7440, rx7620, rx7640)

There are 3 studs with thumb nuts located at the rear of the server chassis. The line cord anchor
installs on these studs.
To install the line cord anchor:
Voltage is present at various locations within the server whenever a power source
Do not route data and power cables together in the same cable management arm.
Cabling and Power Up
59

Advertisement

Table of Contents
loading

This manual is also suitable for:

Integrity rx76409000 rp7440

Table of Contents