HOW TO FINISH UNPACKING

Place packed appliance next to the cabinet in
which it will be installed.
Remove the appliance packing except for bottom
tray which should be left in position until the
appliance is ready to be fitted into its cabinet.
It is imperative that the appliance is left in the
base to protect both the appliance and the
floor.
Ensure the user is given these operating
instructions.

TOOLS REQUIRED

The following tools will be needed and it helps to
assemble them before starting to install the oven:-
A terminal screwdriver (3mm wide blade)
A pozidrive screwdriver
Pliers
Wirestrippers
Knife
Sidecutters
Adhesive Tape
Tape Measure
MAKING THE ELECTRICAL
CONNECTIONS
Important:
Switch
miniature
circuit
appropriate,
commencing any electrical work

PREPARING CABLE

We recommend you use a new length of cable to
ensure your safety.
Ensure you have the correct length of cable
appropriate to the wiring method you are using.
When fitting new cable allow sufficient cable for
removal of the unit at a later date, should it be
necessary.
Score, but do not cut through, around the
sheathing with a knife 100mm (4in) from each end
of the cable and break through to the encased
wires by bending the cable backwards and
forwards to fatigue the sheathing.
Carefully score down from each end of the cable
sheathing along the length of the bare earth wire
(if a cut was made along the length of the live and
neutral wires, it might cut into their sheathing) to
the cuts already made.
Carefully prise open the sheathing at each end of
the cable to expose the encased wiring.
off
at
mains,
breaker
and,
remove
fuse
before
if