HP 7102dl - ProCurve Secure Router Configuration Manual page 122

Procurve secure router 7000dl series - advanced management and configuration guide
Hide thumbs Also See for 7102dl - ProCurve Secure Router:
Table of Contents

Advertisement

Configuring Backup WAN Connections
Configuring Demand Routing for Backup Connections
3-34
In 60 seconds, the ProCurve Secure Router will try to process the connect
sequences again (although the demand interface will remain down in recovery
active mode). If that attempt is unsuccessful, the ProCurve Secure Router will
try again in 60 seconds. Based on the configuration in Figure 3-8, the ProCurve
Secure Router will try up to five times or until a connection is successful.
If all the connection attempts made during the recovery active mode are
unsuccessful, the ProCurve Secure Router will change the status of the
demand interface to DOWN (recovery failed) until you intervene by shutting
down the demand interface or clearing the connection. If the demand interface
succeeds in establishing the backup connection, the ProCurve Secure Router
will change the status of the demand interface to UP (connected), activate the
IP address for the interface, and reinstate any routes that use the interface.
Figure 3-9 summaries this process.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Procurve secure router 7203dl j8753a j8753a

Table of Contents