Rack/Site Preparation Utility - HP DL360 - ProLiant - G3 Deployment Manual

High-density deployment
Hide thumbs Also See for DL360 - ProLiant - G3:
Table of Contents

Advertisement

HP ProLiant DL360 G3 Server High-Density Deployment
Rack/Site
Preparation Utility
The
Rack/Site Installation Preparation Utility
and air flow requirements for a complete server installation. In addition, the
Installation Preparation Utility
requirements of individual components.
The Rack/Site Preparation utility is accessed through the HP active answers web site.
The user is presented with the main screen (Figure 6), which includes four control/result
areas, individual calculator tabs, and a rack space indicator.
Figure 6. Opening Screen Of Rack/Site Installation Preparation Utility
Control/result areas
will calculate all power, vertical rack space,
includes sub-calculators for determining the power
Preliminary
Rack/Site
Rack space
indicator
Select tab for
DL360G3 calculator
16