Installing The Operation Panel; Connecting The Ground Wire - Brother LK3-B432E MKII Instruction Manual

E series electronic lockstitch bar tacker electronic lockstitch belt loop bar tacker electronic lockstitch eyelet buttonhole end bar tacker electronic lockstitch decorative pattern tacker
Hide thumbs Also See for LK3-B432E MKII:
Table of Contents

Advertisement

3. INSTALLATION

3-11 . Installing the operation panel

The operation panel can be installed to either the top or bottom of the work table.
Top of work table
e
t
1. Install the rear frame q to the work table (top or bottom) with the four wood screws w.
2. Install the front frame e to the rear frame q with the four screws r.
* The vertical orientation of the front frame e is the same whether it is installed to the top or the bottom of
the work table.
3. Insert the connector cord t into the control box through the hole at the side of the box. Refer to "3-13.
Connecting the cords" for details on connecting the cord.
4. Secure the connector cord t with the staples (in three places).

3-12 . Connecting the ground wire

Be sure to connect the ground. If the ground connection is not secure, you run the risk of receiv-
ing a serious electric shock, and problems with correct operation may also occur.
13
r
q
w
t
Table
CAUTION
Red
White
Black
Yellow/Green
LK3-B430E-, B431E-, B432E-, B433E- Mark II
Bottom of work table
e
Connect to the power switch. However, the
black wire is insulated to the inside of the box
and is not used.
Connect to ground
r
q
Table
w

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents