Testing components to and from the HBA

1.
Connect to the switch and log in as admin.
2.
Issue the fPortTest command.
See the HP StorageWorks Fabric OS 5.x command reference guide for information on the command
options. The following example executes the fPortTest command 100 times on port 8 with payload
pattern 0xaa55, pattern width 2 (meaning word width) and a default payload size of 512 bytes:
switchname:admin> fporttest 100,8,0xaa55,2, 512
Will use pattern: aa55
Running fPortTest ........
port 8 test passed.
value = 0
Table 27
provides a list of additional tests that can be used to determine the switch components that are
not functioning properly. See the HP StorageWorks Fabric OS 5.x command reference guide for additional
command information.

Switch component tests

Table 27
Test
portloopbacktest
portregtest
spinsilk
sramretentiontest
crossporttest
turboramtest
statstest
Related Switch Test Option:
itemlist

Correcting link failures

A link failure occurs when a server or storage device is connected to a switch, but the link between the
server or storage device and the switch does not come up. This prevents the server or storage device from
communicating through the switch.
If the switchShow command or LEDs indicate that the link has not come up properly, use one or more of
the following procedures.

Determining whether the negotiation was successfully completed

The port negotiates the link speed with the opposite side. The negotiation usually completes in 1–2
seconds; however, sometimes the speed negotiation fails.
NOTE:
Skip this procedure if the port speed is set to a static speed through the portCfgSpeed
command.
aa55
aa55 aa55
Function
Functional test of port N to N path.
Read and write test of the ASIC SRAMs and registers.
Functional test of internal and external transmit and receive paths at full speed.
Test to verify that the data written into the miscellaneous SRAMs in the ASIC are
retained after a 10-second wait.
Test to verify that the functional components of the switch.
Test to verify that the on chip SRAM located in the 2 Gbit/sec ASIC is using the
Turbo-Ram BIST circuitry. These same SRAMs are tested by portregtest and
sramretentiontest using PCI operations, but for this test the BIST controller is
able to perform the SRAM write and read operations at a much faster rate.
Test to verify that the ASIC statistics counter logic.
Option to restrict the items to be tested to a smaller set of parameter values that
you pass to the switch.
aa55
aa55 ...
Fabric OS 5.x administrator guide 157