Shed Assembly —Doors/continued
35
SHED
ASSEMBLY
36
Attach shelf (S) in desired location with four screws (X).
Repeat for remaining
shelf (S). Note: For clarity,
illustration
is shown
with roof, and front header
removed. Shelf can be located in any of the four
corners.
X2
x2
- SHELF
From the outside of doors, insert door handles (BB)
through handle plate holes. On inside of doors, place
spacers (DD) on each door handle, and secure each
with one pan head screw (GG).
x2
Complete.
23
Need help?
Do you have a question about the 65006 and is the answer not in the manual?