Cisco WS-C6503 Manual page 74

Supervisor engine guide
Table of Contents

Advertisement

Installing a Supervisor Engine
c.
Figure 3-2
Clearing the EMI Gasket in a Horizontal Slot Chassis
1
2
3
Press down
4
5
6
3
4
4
5
6
6
d.
e.
f.
Catalyst 6500 Series Supervisor Engine Guide
3-6
Using the thumb and forefinger of each hand, grasp the two ejector levers and gently press down to
create a small 0.040 inch (1 mm) gap between the supervisor engine's EMI gasket and the module
or cover plate above it. (See
Note
Do not press down too forcefully on the levers because they will bend and get damaged.
While gently pressing down, simultaneously close the left and right ejector levers to fully seat the
supervisor engine in the backplane connector. The ejector levers are fully closed when they are flush
with the supervisor engine faceplate.
Failure to fully seat the supervisor engine in the backplane connector can result in error
Note
messages.
Tighten the two captive installation screws on the supervisor engine.
Make sure the ejector levers are fully closed before tightening the captive installation
Note
screws.
Verify that the supervisor engine STATUS LED is lit.
Figure
3-2.)
Press down
1mm
Gap between the module
EMI gasket and the
module above it
Chapter 3
Installing Supervisor Engines
OL-7397-03

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ws-c65066509e - catalyst switchCatalyst 6500 series

Table of Contents