M4M 30 NETWORK ANALYZER USER MANUAL
2. Packaging contents
Packaging contents
1
2
3
4
5
The number and type of removable terminals in the package varies according to the different versions.
Please refer to below table to check the removable terminals included in each package.
Product
Name
M4M 30
MODBUS
M4M 30M
MODBUS
M4M 30
ETHERNET
M4M 30M
ETHERNET
M4M 30
PROFIBUS
M4M 30 I/O
M4M 30
BACNET
M4M 30
ROGOWSKI
Please notice that terminals for current input on M4M 30 Rogowski are prewired on ABB's R4M Rogowski
coils
1
H o
m e
G r
a p
h ic
s
D a
t a
R e
H is
a d
t o
in g
r ic
a ls
C o
n f ig
u r a
t io
n
4
Network analyzer M4M 30 or M4M 30M (MID)
Installation manual
Calibration certificate
Installation accessories (removable terminals, fixing clips)
M4M 30M (MID): Sealable terminal block
Current input
Voltage input
Au□iliary supply
terminal
terminal
terminal
(8 poles)
(4 poles)
(2 poles)
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
2
M4M Calibration Certificate
Contact us
5.3. Type of network
3.Symbol instructions
ABB S.p.A.
Select the type of network among the
following ones
Electrification Business
Button
Function
Viale dell'Industria, 18
20010 Vittuone (MI) Italy
Shortcut to Home/Favorite/
https://new.abb.com/low-voltage
Notifications pages.
→
→ Installation → Type of network
Warning! Installation by person
Return to the previous page.
Parameter
Description
with electrotechnical expertise
Test Conditions
only.
Hom
e
Increase or decrease the
3Ph/4W/4CT
3-phase 4-wire + 4CTs
Warnung! Installation nur durch
value. Keeping pressed will
elektrotechnische Fachkraft.
Graph
s
increase the speed of the
V1
V2
V3
I1
I2
I3
No.
3Ph/4W/3CT
3-phase 4-wire + 3CTs
PF
Avvertenza! Fare installare solo da
Data
Readi
number variation.
[V]
[V]
[V]
[A]
[A]
[A]
un elettricista qualificato.
ricals
Histo
ng
3Ph/4W/1CT
3-phase 4-wire + 1CT
Confi
gurat
Move cursor up or down .
ion
#1
230
3Ph/3W/1CT
230
3-phase 3-wire + 1CT
230
6
6
6
1
3Ph/3W/3CT
3-phase 3-wire + 3CTs
3.1.Instruction
3Ph/3W/2CT
3-phase 3-wire + 2CTs
#2
230
230
230
0,9
0,9
0,9
1
QR Code for online
1Ph/2W/1CT
1-phase 2-wire + 1CT
User Manual.
Button
Action
Network analyzer
#3
230
230
230
0,15
0,15
0,15
1
INSTALLATION MANUAL
Press this button
© Copyright 2019 ABB S.p.A. All rights
reserved. Specification subject to change
M4M 30
#4
230
230
230
6
6
6
0,5 ind.
without notice.
3Ph/4W/4CT
#5
230
3Ph/4W/3CT
230
230
0,9
0,9
0,9
0,5 ind.
2.2.Wiring Diagram
1.Packaging Content
4.Access to device
1a
3Ph/4W/1CT
•
Network analyzer M4M 30
3-phase 4-wire network with 4CTs
#6
230
1b
230
3Ph/3W/1CT
230
0,15
0,15
0,15
0,5 ind.
•
Installation manual
•
Calibration certificate
Home
•
2 mounting clips
#7
230
230
230
1,5
1,5
1,5
1
•
Removable terminals for wiring
Graphs
Data Reading
#8
230
230
230
0,2
0,2
0,2
1
3-phase 4-wire network with 3CTs
5.4.Current Transformer ratio
Historicals
Configuration
#9
230
230
230
1,5
1,5
1,5
0,5 ind.
2.Mounting
Select the current transformer Ratio among
the default ones or enter it manually.
2.1.Assembly
Access to device is done through touch
screen. The home page is divided in four
#10
230
230
230
0,2
0,2
0,2
0,5 ind.
sections:
#11
230
→
230
→ Installation → CT ratio
230
6
6
6
0,5 ind.
Sections
Description
3-phase 4-wire network with 1CT
Graphical representation of
CT ratio L1 L2 L3
Graphs
the main parameters;
#12
230
230
230
0,9
0,9
0,9
0,5 ind.
Value of the main
Manual
Manual
1a
Data Reading
parameters.
40/5 A
1
Historicals
Values recorded in the
#13
230
230
230
0,15
0,15
0,15
0,5 ind.
flash memory.
50/5 A
Configuration
Setup of the device.
1b
60/5 A
#14
58
58
58
6
6
6
1
3-phase 3-wire network with 1CT
#15
58
58
58
6
6
6
0,5 ind.
In case of manual entry, enter the value
5.First Commissioning
of the primary with + or - and select the
secondary (1A or 5A).
#16
230
230
230
6
-
6
1
To start to use the analyzer it is mandatory
to configure the basic setting (password,
CT ratio L1 L2 L3
language, type of network, CT ratio and VT
ratio).
#17
230
230
230
0,9
-
0,9
1
3-phase 3-wire network with 3CTs
#18
230
230
230
0,15
-
0,15
1
5.1.Setting password
1
2
2
Confirm
The password is composed by 5 numerical
characters. After entering the password it is
#19
230
230
230
6
-
6
0,5 ind.
needed to press Confirm.
3
3-phase 3-wire network with 2CTs
#20
230
230
230
0,9
-
0,9
0,5 ind.
If a 4
th
CT is used, CT ratio for
Neutral has to be configured.
→
#21
230
230
230
0,15
-
0,15
0,5 ind.
Enter Password
Current Password
2-phase 3-wire network with 2CTs
This Calibration Certificate may not be reproduced, in whole or in part,
5.5.Voltage Transformer ratio
without written permission of ABB
1
Enter the voltage transformer ratio (both
primary and secondary) manually with + or -
Confirm
3
2
→
→ Installation → VT ratio
1-phase 2-wire network with 1CT
Default password is 00000. At first
VT ratio
use, the password shall be defined.
4
In order to disable the password,
please enter 00000.
1
2
5.2.Setting language
3
For current measurement, please
→
→ Unit → Language
notice that it is needed to fasten the
Finalize the installation through
screw-type terminal to the device
Select the desired language for the display
In case of direct insertion,
removable terminals.
400/400V value shall be used.
with the two screws.
among the ones available.
4
Programmable
Programmable
I/O terminal n.1
I/O terminal n.2
(5 poles)
(3 poles)
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
3
Test
Test Description
Accuracy
Result
Results
Limit
Verification –
-0,01%
±0,5%
Passed
Active energy (Import)
Verification –
-0,01%
±0,5%
Passed
Active energy (Import)
Verification –
-0,01%
±0,5%
Passed
Active energy (Import)
Verification –
-0,01%
±0,5%
Passed
Active energy (Import)
Verification –
-0,01%
±0,5%
Passed
Active energy (Import)
Verification –
-0,01%
±0,5%
Passed
Active energy (Import)
Verification –
-0,01%
±0,5%
Passed
Active energy (Import)
Verification –
-0,01%
±0,5%
Passed
Active energy (Import)
Verification –
-0,01%
±0,5%
Passed
Active energy (Import)
Verification –
-0,01%
±0,5%
Passed
Active energy (Import)
Verification –
-0,01%
±0,5%
Passed
Active energy (Import)
Verification –
-0,01%
±0,5%
Passed
Active energy (Import)
Verification –
-0,01%
±0,5%
Passed
Active energy (Import)
Verification –
-0,01%
±0,5%
Passed
Active energy (Import)
Verification –
-0,01%
±0,5%
Passed
Active energy (Import)
Verification –
-0,01%
±0,5%
Passed
Active energy (Import)
Verification –
-0,01%
±0,5%
Passed
Active energy (Import)
Verification –
-0,01%
±0,5%
Passed
Active energy (Import)
Verification –
-0,01%
±0,5%
Passed
Active energy (Import)
Verification –
-0,01%
±0,5%
Passed
Active energy (Import)
Verification –
-0,01%
±0,5%
Passed
Active energy (Import)
5
Analogue
RS485 terminal
outputs terminal
(3 poles)
(3 poles)
□
□
□
□
□
7
Need help?
Do you have a question about the M4M 30 and is the answer not in the manual?