Activating A Package On The Router: Example - Cisco CRS-1 - Carrier Routing System Router Getting Started Manual

Carrier routing system
Hide thumbs Also See for CRS-1 - Carrier Routing System Router:
Table of Contents

Advertisement

Chapter 6
Managing Cisco IOS XR Software Packages
[hfr-mcast:ipv4-msdp]
[hfr-mcast-1.2.0.CSCdy123:ipv4-pim]
[hfr-mcast-1.2.0.CSCdy123:ipv4-pim]

Activating a Package on the Router: Example

In the following example, the Multicast package is activated on all appropriate router cards:
RP/0/RP0/CPU0:router# install activate disk0:hfr-mcast-1.2.0
Install: The idle timeout on this line will be suspended for synchronous install
operations
Install: Starting install operation. Do not insert or remove cards until the operation
completes.
Install: Now operating in asynchronous mode. Do not attempt subsequent install operations
until this operation is complete. RP/0/RP0/CPU0:router#Install 2: Install operation
'activate disk0:hfr-mcast-1.2.0' assigned request id: 2 Install 2: Performing
Inter-Package Card/Node/Scope Version Dependency Checks Install 2:
Checking API compatibility in software configurations... Install 2: [OK] Install 2:
Updating software configurations.
Install 2:
Install 2:
Install 2: Checking running configuration version compatibility with newly activated
software ... Install 2: No incompatibilities found between the activated software and
router running configuration. Install 2: Node 0/2/CPU0: 1 hfr-mcast processes affected (0
updated, 1 added, 0 removed, 0 impacted) Install 2: Node 0/3/CPU0: 1 hfr-mcast processes
affected (0 updated, 1 added, 0 removed, 0 impacted) Install 2: Node 0/RP0/CPU0: 9
hfr-mcast processes affected (0 updated, 9 added, 0 removed, 0 impacted) Install 2:
Activation operation successful. Install 2: NOTE: The changes made to software
configurations will not be Install 2: persistent across RP reloads. Use the command
'install commit' Install 2: to make changes persistent. Install 2: Idle timeout on this
line will now be resumed for synchronous install operations
RP/0/RP0/CPU0:router# install commit
Install: The idle timeout on this line will be suspended for synchronous install
operations Install 3: Install operation 'commit' assigned request id: 3 Install 3:
Committing uncommitted changes in software configuratons. Install 3: Commit operation
successful. Install 3: Idle timeout on this line will now be resumed for synchronous
install operations
Node class: RP
1 node(s): 0/RP0/CPU0
2 Changed or Impacted Servers that will be restarted
0 (I: ) msdp
1 (C: )
libpim_register_api.dll
0 (C: ) pim
RP,DRP,LC:
Activating hfr-mcast-1.2.0
Configuration Examples for Managing Packages
Cisco CRS-1 Series Carrier Routing System Getting Started Guide
server
DLL
server
[OK] Install 2:
6-33

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Crs-1 series

Table of Contents