HP StorageWorks 64 - SAN Director Switch Planning Manual page 143

Storageworks san high availability
Hide thumbs Also See for StorageWorks 64 - SAN Director Switch:
Table of Contents

Advertisement

Physical Planning Considerations
The figure illustrates two Director 2/64 directors connected by two ISLs. Three
servers use the ISLs to communicate with two storage devices. Without trunking,
servers 1 through 3 route Fibre Channel traffic to director B without regard to any
data rates. A possible scenario is that servers 1 and 2 route high data rate traffic
through ISL 1 to storage device 1 (ISL oversubscription) and server 3
routes low data rate traffic through ISL 2 to storage device 2
(ISL undersubscription).
SAN High Availability Planning Guide
143

Advertisement

Table of Contents
loading

This manual is also suitable for:

316095-b21 - storageworks edge switch 2/24Storageworks 2/140 - director switchStorageworks 2/24 - edge switch316095-b21 - storageworks edge switch 2/24Storageworks 2/140 - director switchStorageworks 2/24 - edge switch ... Show all

Table of Contents