Modulation air-water-heat pumps for indoor installation (68 pages)
Summary of Contents for iDM AERO SLM 6-17
Page 1
N AV I G AT O R 2 . 0 c o n t r o l w i t h N AV I G AT O R 2 . AIR HEAT PUMP WITH INVERTER-TECHNOLOGY HEAT PUMPS FROM AUSTRIA www.idm-energie.at...
3.8. Connections outdoor unit AERO SLM 6-17 3.9. Technical data 3.10. Performance data AERO SLM 3-11 acc. to EN 14511 - heating 3.11. Performance data AERO SLM 3-11 acc. to EN 14511 - cooling 3.12. Performance data AERO SLM 6-17 acc. to EN 14511 - heating 3.13.
Page 3
It is essential heat pump. that this information is observed! General instructions on operating the Space for customer service telephone heat pump. number:_________________________ All rights reserved for modifi cations to the technology and design! (C) IDM ENERGIESYSTEME GMBH Installation instructions AERO SLM...
. Heat pumps may only be installed by competent specialist staff and commissioned by a customer Heat pumps should not be installed in rooms with high service company trained to do so by iDM Energiesys- electromagentic infl uences from other installations! teme GmbH.
Only original spare parts the indoor unit. Also the boiler room where the indoor which meet the requirements of iDM may be used! unit of the AERO SLM is installed should be placed outside of the noise sensitive living area. The boiler room should be furnished with a good lockable door.
The sound power be calculated with the iDM-sound calculator. can only be determined via mathematical calculation calculation of the sound pressure level shall be calc...
Page 7
Finally, the determined rating level can be compared with legal limit values (e.g. „TA Lärm“). (C) IDM ENERGIESYSTEME GMBH Installation instructions AERO SLM...
- Non-return valve door unit are not in the scope of delivery of the heat pump. The parts are available as accessories and must be connected according to the technical specifi cations. (C) IDM ENERGIESYSTEME GMBH Installation instructions AERO SLM...
3 . 4. Co n n ection s i n door u n it A ER O S LM 3- 11 and A ER O S L M 6- 17 1 HGL fl ow 2 Heatpump fl ow 3 Heat pump return 4 Cable inlet main current 5 Refrigerant pipes 6 LAN-Connection 7 Cable inlet sensors (C) IDM ENERGIESYSTEME GMBH Installation instructions AERO SLM...
3 .6. Co n n ections ou t d oor u n it AE R O SLM 3- 1 1 (V i e w f r o m be lo w) Outlet side Refrigerant pipe connections Ø12 mm und Ø16 mm Condensation drain 1“ Inlet side (C) IDM ENERGIESYSTEME GMBH Installation instructions AERO SLM...
3 . 7. Dimen si ons ou t door u n it AER O S LM 6- 1 7 Side view / left Front view Outlet side Inlet side 3 . 8. Co n n ection s ou t d oor un it AE R O SLM 6- 1 7 (C) IDM ENERGIESYSTEME GMBH Installation instructions AERO SLM...
Sound power level maximum outdoor unit dB(A) Sound reduced operation outdoor unit (reduced power) dB(A) The sound pressure level can be calculated with the iDM-sound calculation tool Dimensions indoor unit Height / Width / Depth 1262/ 620 / 762 Weight Minimum size of installation room (with standard fi...
Page 13
Heat pump type AERO SLM 3-11 HGL AERO SLM 6-17 Unit Maximum heating supply temperature °C Regrigerant R410A R410A Quantity of refrigerant 4.1 (up to 6 m) 4.78 (up to 6 m) 1924 Compressor oil EMKARATE RL 32-3MAF Quantity of compressor oil 0.99...
All 3 requirements must be fulfi lled independently. This is possible applying the NAVIGATOR Pro. The entire distribution system has to fulfi ll the 3 mentioned requirements. To ensure a large cooling demand, the cooling limit has to be set as high as possible. (C) IDM ENERGIESYSTEME GMBH Installation instructions AERO SLM...
Page 16
3. Description description Heat output AERO SLM 3-11 at fl ow temperature 35°C NOMINAL Air-inlet temperature [°C] Heat output AERO SLM 3-11 at fl ow temperature 45°C NOMINAL Air-inlet temperature [°C] (C) IDM ENERGIESYSTEME GMBH Installation instructions AERO SLM...
Page 17
Heat output AERO SLM 3-11 at fl ow temperature 55°C NOMINAL Air-inlet temperature [°C] Heat output AERO SLM 3-11 at nominal speed Air-inlet temperature [°C] (C) IDM ENERGIESYSTEME GMBH Installation instructions AERO SLM...
For pipe length more than 6 m, the following refrigerant quantities must be refi lled. AERO SLM 3-11 Refrigerant re-fi ll quantity AERO SLM 3-11 HGL Refrigerant re-fi ll quantity AERO SLM 6-17 HGL (C) IDM ENERGIESYSTEME GMBH...
3 . 16. Limi ts of u se The heating of other fl uids as heating water is not permitted with the AERO SLM 3-11 and AERO SLM 6-17 (for heating water quality, see page 44). Heat pumps are by nature subjects to limits of use regarding of pressure and temperature (see diagram).
Page 24
3. Description description AERO SLM 3-11 and 6-17 - Heating [°C] R410A 35 40 [°C] outdoor temperature The minimum heat pump fl ow temperature is the lowest temperature that the heat pump can produce (depending on the heat source temperature) and is then switched off at this value. Due to the hydraulic spread across the heat pump, the control-related switching hysteresis and the humidity-dependent dew point, it is not possible to reach this temperature in the cooling circuit.
fi xing screws must be loosen. After that the cover can be unhinged and removed. Loosen the fi xing screws on the outdoor unit When transporting, the AERO SLM may not be tilted more than 30°! (C) IDM ENERGIESYSTEME GMBH Installation instructions AERO SLM...
The connections for the heating supply and return are 2. impact sound insulation 3. screed located inside the housing and can be led out either 4. recess on the right or left side of the heat pump. (C) IDM ENERGIESYSTEME GMBH Installation instructions AERO SLM...
The fi xing screws are located on the front as shown crosswise and not cut out completely. in the photo below. Cut in the rubber gromments Then the grommets are mounted in the bushing du- ring the installation of the connecting hoses. (C) IDM ENERGIESYSTEME GMBH Installation instructions AERO SLM...
Page 28
Now the connecting hoses can be connected as described as followed. Where the connection hoses are mounted is specifi ed with stickers inside the heat pump. Fully assembled connecting hoses AERO SLM 3-11 Connection HGL pipe (C) IDM ENERGIESYSTEME GMBH Installation instructions AERO SLM...
If the alignment is not possible at very windy loca- tions, additional wind protection can be installed, e.g. a hedge. (C) IDM ENERGIESYSTEME GMBH Installation instructions AERO SLM...
Air heat pumps are producing condensation water during operation. This could be 6 liters per defrost cycle within 2 minutes. The condensate run-off must be frost-proof. (C) IDM ENERGIESYSTEME GMBH Installation instructions AERO SLM...
Connection for the equipotential bonding or lightning protection AERO SLM 3-11 Mounting of the outdoor unit AERO SLM 3-11 Mounting of the outdoor unit AERO SLM 6-17 Connection for the equipotential bonding or lightning protection...
The heating band (2 m) will be placed in the drain hose. The condensation bin and the run- off have to be checked for soiling regularly The minimum distances must be maintained due to perform maintenance. (C) IDM ENERGIESYSTEME GMBH Installation instructions AERO SLM...
The soldered connections must be made according to the requirements of the cooling technology by a To avoid buckles in the refrigerant pipes, the minimum trained refrigeration engineer licensed by IDM-Ener- bend radius must be observed. To prevent embritt- giesysteme GmbH.
The refrigerant pipes will be soldered to the indoor unit. The soldered connections must be made accor- ding to the requirements of the cooling technology by a trained refrigeration engineer licensed by iDM Energiesysteme GmbH. The connections for the refrigerant pipes are on the backside of the AERO SLM indoor unit.
PVC pipe. rised by iDM Energiesysteme GmbH. After completing the installation the wall opening The refrigerant fl ow through the indoor unit can lead to must be sealed on site using a suitable sealing mass fl...
When working on the heat pump, please be sure that the device is tensionless. The design of the residual current circuit breaker depends on the heat pump type and power rating! (C) IDM ENERGIESYSTEME GMBH Installation instructions AERO SLM...
If the front part AERO SLM 3-11 must be removed in case of maintenance, there may be damages to the connections of the control unit or the main board by careless and rapid remove.
When removing the panel, the connecting cable should not be exposed to tensile stress. To comple- tely remove the panel, the connection cable on the Disconnect the cable to the control panel central unit must be unplugged. (C) IDM ENERGIESYSTEME GMBH Installation instructions AERO SLM...
The sensor positions are shown in the relevant instal- NAVIGATOR Pro additional board lation diagram. To use the iDM single-room control, an additional The position of the sensors are shown in the relevant board must be connected to the touch display of NA- hydraulic scheme of the heat pump.
R410A) should be checked and the set shut-off If an error occurs several times in succes- temperature changed if necessary. sion, please contact your relevant iDM - If the heat pump is to be drained on the heating customer service department.
9 . 2. A ERO S LM w it h m i xe d c irc u it , H yg ie ni k 2. 0 w i t h s e pa r at i o n pla t e Installation instructions AERO SLM (C) IDM ENERGIESYSTEME GMBH...
The system must only be connected to the mains and put into operation if the entire heating system has been fi lled and bled, as otherwise the circulating pumps may run dry. (C) IDM ENERGIESYSTEME GMBH Installation instructions AERO SLM...
Page 50
PRACTICAL KNOWLEDGE FOR SALES AND TECHNOLOGY The comprehensive range of seminars for sp ecialists at the IDM POWER FA MILY is available to you any time on our websit. We look for ward to re ceiving your re gist ration.
Need help?
Do you have a question about the AERO SLM 6-17 and is the answer not in the manual?
Questions and answers