Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Carbolite Gero Manuals
Furnace
301
Installation, operation and maintenance instructions
Carbolite Gero 301 Installation, Operation And Maintenance Instructions
1100 c chamber furnace - elf model 14 litres with controller
Hide thumbs
1
Table Of Contents
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
page
of
52
Go
/
52
Contents
Table of Contents
Bookmarks
Table of Contents
Table of Contents
1 Symbols and Warnings
Switches and Lights
General Warnings
2 Installation
Unpacking and Handling
Siting and Setting up
Chimney
Hearth
Door Vents
Electrical Connections
301 Controller
PID Control
Basic Operation of the 301 Controller
Menu System
Navigation Diagram
Basic Function Guide
Home Display
Hold Mode
Checking the Temperature Setpoint from the Home Display
Changing the Temperature Setpoint
Changing the Temperature Setpoint Ramp Rate
Changing the Timer Time
Advanced Operation
Entering the Setup Menu
Changing the Timer Type
Changing the Timer Band
Changing the Maximum Output Power
Changing the Customer Calibration Type
Calibration Password
Temperature Setpoint Ramp Rate
Setpoint Ramp Rate
Limitations of Setpoint Ramp Rate
The Timer
Starting the Timer
Checking the Time Remaining
Pausing the Timer
Resetting the Timer
Timer Function Description
The Timer Temperature Band
Timer Function Table
Ramp Dwell Programming
Setting up a Ramp Dwell Program
Maximum Output Setting
Customer Calibration
Factory Calibration - Fact
Single Point Calibration - C.CL1
Changing the Single Point Calibration Offset - Ofst
Dual Point Calibration - C.CL2
Changing the Calibration, Low Temperature - CAL.L
Changing the Calibration, Low Temperature Offset - OFS.L
Changing the Calibration, High Temperature - CAL.H
Changing the Calibration, High Temperature Offset - OFS.H
Over-Temperature Protection
Over-Temperature (O/T) Home Display
Changing the Over-Temperature Limit
Checking the Over-Temperature Sensor Temperature
Over-Temperature Protection Calibration
Over-Temperature Activation
Resetting Over-Temperature Activation
RS232 Communication Option
Temperature Controller Replacement
Glossary of Terms
Controller Fault
4 Operation
Operating Cycle
General Operating Notes
Use of Probes
Atmospheres
Operator Safety
Power Adjustment
5 Maintenance
General Maintenance
Cleaning
Safety Switch
Calibration
After-Sales Service
Recommended Spare Parts and Spare Parts Kit
6 Repairs and Replacements
Safety Warning - Disconnection from Power Supply
Safety Warning - Refractory Fibre Insulation
Temperature Controller Replacement
Solid-State Relay Replacement
Thermocouple Replacement
Element Replacement
Fuse Replacement
Door Plug Replacement
Air Inlet Adjustment
7 Fault Analysis
Furnace Does Not Heat up
Product Overheats
8 Wiring Diagrams
Wa-11-31
9 Fuses and Power Settings
Fuses
Power Limit
10 Specifications
Environment
Service Record
Advertisement
Quick Links
1
301 Controller
2
Basic Operation of the 301 Controller
Download this manual
Installation, Operation and Maintenance Instructions
1100 °C Chamber Furnace - ELF Model: 14 Litres
301 Controller
ELF 11/14B + 301 Controller
MEN-ELF1114B-01_301
28-11-2017
(
)
Table of
Contents
Previous
Page
Next
Page
1
2
3
4
5
Advertisement
Table of Contents
Need help?
Do you have a question about the 301 and is the answer not in the manual?
Ask a question
Questions and answers
Related Manuals for Carbolite Gero 301
Furnace Carbolite Gero HTF 17/10 Installation, Operation And Maintenance Instructions
1700c, chamber furnace, htf 10 litres with controller (50 pages)
Furnace Carbolite Gero 3508 Installation, Operation And Maintenance Instructions
1100 'c ashing furnace aaf model 18 litres (52 pages)
Furnace Carbolite Gero MTT 12/38/850 Installation, Operation And Maintenance Instructions
1200 c carbon 14 tritium analysis furnace 850mm controller (56 pages)
Furnace Carbolite Gero EVZ 12/600B Installation, Operation And Maintenance Instructions
1200 c tube furnace (3-zone) (58 pages)
Furnace Carbolite Gero ELF 11/14B Installation, Operation And Maintenance Instructions
1100 c chamber furnace - elf model 14 litres with controller (52 pages)
Furnace Carbolite Gero HTRH Operating Instructions Manual
Standard furnace (23 pages)
Furnace Carbolite Gero GPCMA 174 Installation And Operation Instructions Manual
1000-1150 c retort chamber furnace (50 pages)
Furnace Carbolite Gero EVZ 12/450B Installation, Operation And Maintenance Instructions
1200 c tube furnace (3-zone) - evz model: 450mm no controller (40 pages)
Furnace Carbolite Gero EVT 12/150B Installation, Operation And Maintenance Instructions
(34 pages)
Furnace Carbolite Gero TS1 12/60/150 Maintenance Instruction
1200 c split tube furnace - ts1 150mm 60mm (70 pages)
Furnace Carbolite Gero AAF 11/18 Installation, Operation And Maintenance Instructions
1100 'c ashing furnace aaf model 18 litres (52 pages)
Furnace Carbolite Gero BLF 17/3 Installation, Operation And Maintenance Instructions
1700 c bottom loading furnace, 3 litres no controller (34 pages)
Summarization of Contents
Symbols and Warnings
Switches and Lights
Explains the function of instrument and heat indicator lights.
General Warnings
Provides crucial safety warnings for electric shock and hot surfaces.
Installation
Unpacking and Handling
Instructions for safely removing and moving the furnace.
Siting and Setting Up
Guidance on choosing a suitable location and stable surface for the furnace.
Chimney
Details on fitting and using the chimney for fume extraction.
Hearth
Information about the ceramic tile hearth used in the chamber.
Door Vents
How to adjust door vents for increased chamber airflow.
Electrical Connections
Procedures and warnings for safely connecting the furnace to the electrical supply.
301 Controller Operations
PID control
Explanation of the PID temperature control system used by the controller.
Basic Operation of the 301 Controller
Overview of the controller's display, keys, and fundamental functions.
Advanced Operation
Details on accessing and using advanced controller settings and menus.
Temperature Setpoint Ramp Rate
How to set and manage the rate of temperature change in the furnace.
The Timer
Instructions for using the controller's built-in timer functions.
Ramp Dwell Programming
Guide to setting up programs with multiple temperature ramp and dwell segments.
Maximum Output Setting
Information on adjusting the maximum power output limit of the furnace.
Customer Calibration
Procedures for calibrating the controller for accurate temperature readings.
Over-Temperature Protection
How to configure and manage the safety feature preventing overheating.
RS232 Communication Option
Details on connecting the controller to external devices via RS232.
Temperature Controller Replacement
Steps and precautions for replacing the temperature controller unit.
Glossary of Terms
Definitions of technical terms used within the manual.
Controller Fault
Guidance on diagnosing and resolving common controller errors and faults.
Operation
Operating Cycle
Describes the sequence of events when operating the furnace.
General Operating Notes
Important considerations for safe and effective furnace operation.
Use of Probes
Safety precautions and guidelines for using probes inside the furnace.
Atmospheres
Information regarding the use of different gas atmospheres in the furnace.
Operator Safety
Critical safety instructions for operating the furnace and avoiding hazards.
Power Adjustment
Information on how the power limit affects furnace performance.
Maintenance
General Maintenance
Recommended procedures for routine preventive maintenance of the furnace.
Calibration
Guidance on recalibrating the controller and thermocouple for accuracy.
After-Sales Service
Information on obtaining repair, calibration, and maintenance services.
Recommended Spare Parts and Spare Parts Kit
Details on essential spare parts and kits available for the furnace.
Repairs and Replacements
Safety Warning - Disconnection from Power Supply
Crucial safety instruction to disconnect power before repairs.
Safety Warning - Refractory Fibre Insulation
Precautions and health advice for handling refractory fibre insulation.
Temperature Controller Replacement
Instructions for replacing the temperature controller unit.
Solid-state Relay Replacement
Steps for replacing the solid-state relay component.
Thermocouple Replacement
Procedures for replacing the thermocouple sensor.
Element Replacement
Guide on how to replace the furnace heating elements.
Fuse Replacement
Instructions for identifying and replacing fuses.
Door Plug Replacement
Steps for replacing the door plug insulation piece.
Air Inlet Adjustment
How to adjust the air inlet position for ventilation.
Fault Analysis
Furnace Does Not Heat Up
Troubleshooting guide for when the furnace fails to heat.
Product Overheats
Troubleshooting guide for instances where the product overheats.
Wiring Diagrams
WA-11-30
Wiring diagram for single-phase models with indirect safety switches.
WA-11-31
Wiring diagram for single-phase models with safety switches and O/T control.
Fuses and Power Settings
Fuses
Information on fuse types, ratings, and locations.
Power Limit
Explanation of the power limit parameter and its effect on voltage.
Specifications
Environment
Recommended operating and storage conditions for the furnace.
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL
Need help?
Do you have a question about the 301 and is the answer not in the manual?
Questions and answers