Download Print this page
Kohler MODERN LIFE K-77138TW-S01 Installation Instructions Manual
Kohler MODERN LIFE K-77138TW-S01 Installation Instructions Manual

Kohler MODERN LIFE K-77138TW-S01 Installation Instructions Manual

Cabinet

Advertisement

Quick Links

BEFORE YOU BEGIN
Please read these instructions carefully to familiarize
yourself with the required tools, materials, and installation
sequences. Follow the sections that pertain to your
particular installation. This will help you avoid costly
mistakes. In addition to proper installation, read all
operating and safety instructions.
All information in these instructions is based upon the
latest product information available at the time of
publication. Kohler China. reserves the right to make
changes in product characteristics, packaging, or
availability at any time without notice.
These instructions contain important care, cleaning, and
warranty information-
consumer.
MODERN LIFE cabinet adopts E1 grade wood-based
panel of high quality, and with further processing, its
harmful emissions will be less than 1.5mg/L.
Turn off the water supply.
The pluming installation must comply with Water Supply
Regulations/Bye-laws, Building Regulations or any
particular regulations and practices, specified by the local
water company or water undertakers. The installation
should be carried out by a plumber.
Before installation carefully inspect the new fixture for any
signs of damage.
This product complies with GB 24977-2010.
ORDERING INFORMATION
This installation covers the following products in the
MODERN LIFE range:
MODERN LIFE 900mm Cabinet ........................K-77138TW-S01
MODERN LIFE 600mm Cabinet ........................K-77139TW-S01
SAFETY WARNINGS
Kohler products are precision-engineered and should give
continued superior and safe performance, provided:
1. They are installed, commissioned, operated and
maintained in accordance with the recommendations given
in this Manual.
2. Periodic attention is given, as necessary, to maintain the
product in good functional order. Recommended
guidelines are given in the
Carefully inspect the new fixture for any signs of damage.
When installing Kohler Products, manufacturers guidelines for
power tool safety should be followed.
KOHLER CHINA INVESTMENT CO., LTD
1302827-T01-B
please leave instructions for the
section.
MAINTENANCE
JING'AN DISTRICT, SHANGHAI, PRC
科勒(中國)投資有限公司 上海市靜安區江場三路158號 郵編: 200436
安裝之前
請仔細詳閱本指引,以便熟悉所需工具、物料及安裝程
序。請遵照適用的章節來安裝本產品,以免安裝失當導
致不必要的損失。除了有關正確的安裝方法之外,還務
請詳閱所有操作及安全指引。
本指引所載之一切資料,均以印刷時所有之最新產品情
況為基礎,科勒中國保留權力隨時更改產品特性,包裝
或供應情況,恕不另行通知。安裝家具之前,請先確認所
有必需的電器工作均已完成。
本指引也包含了有關保養,清潔及擔保等重要資料,請
交與用戶保存。
明萊浴櫃選用E1級優質飾面人造板精心加工而成,其有
害氣體釋放量少於1.5mg/L。
關閉供水。
管道安裝必須遵循當地所有給排水,建築或者其他的特別
規定。管道安裝人員必須具備相應資格。
安裝之前,請仔細檢查產品是否有損傷。
本產品符合GB 24977-2010。
訂購信息
此安裝說明書適用於以下明萊系列家具的安裝:
明萊
900mm
浴室櫃
.............................................K-77138TW-S01
明萊
600mm
浴室櫃
.............................................K-77139TW-S01
科勒產品經過精確製造,性能卓越,經久耐用。為保證產品品質,
您必須:
1.
按照此手冊推薦的方法進行安裝,啟動,操作及維護。
2.
如有需要,定期檢查,令產品保持良好性能狀態。日常維護章
節中列有推薦方法。
請仔細檢查新產品是否有損傷。
在安裝科勒產品時,必須遵循製造商相關電動工具的安全的指令。
NO.158, JIANG CHANG SAN ROAD,
POST CODE: 200436
Copyright Kohler China Investment Co., Ltd. 2017
©
-1-
版權為科勒(中國)投資有限公司所有
©
MODERN LIFE
INSTALLATION INSTRUCTIONS
K-77138TW-S01/K-77139TW-S01
明萊
安裝說明書
CABINET
浴室櫃
2017

Advertisement

loading
Need help?

Need help?

Do you have a question about the MODERN LIFE K-77138TW-S01 and is the answer not in the manual?

Questions and answers

Summary of Contents for Kohler MODERN LIFE K-77138TW-S01

  • Page 1 All information in these instructions is based upon the 本指引所載之一切資料,均以印刷時所有之最新產品情 latest product information available at the time of 況為基礎,科勒中國保留權力隨時更改產品特性,包裝 publication. Kohler China. reserves the right to make 或供應情況,恕不另行通知。安裝家具之前,請先確認所 changes in product characteristics, packaging, or 有必需的電器工作均已完成。 availability at any time without notice.
  • Page 2: Installation

    K-77139TW-S01 K-77138TW-S01 MODERN LIFE 600mm Cabinet MODERN LIFE 900mm Cabinet 明萊600mm浴室櫃 明萊900mm浴室櫃 Fig.1 圖1 Kohler reserves the right to change marked dimensions without prior notice. 科勒公司保留隨時變更圖中標示尺寸的權利,無需另行通知。 INSTALLATION 安 裝 安裝臉盆櫃 Install Washbasin Cabinet Install the services. 安裝管道 Hot (H) and Cold (C) inlets must be connected to the correct 熱水(H)及冷水(C)入口必須連接至正確的進水管。...
  • Page 3 1. Mark the position of hanged bracket and wall bolt 根據圖示尺寸在牆壁上標示出掛牆托片和配套台盆懸掛螺栓 according to dimensions as illustrated, and loosen the 的位置,並將臉盆櫃吊碼的掛鈎伸長。 suspension hook of washbasin cabinet. Avoid the cables and pipes inner set when 小心!在牆壁上鑽孔時請務必小心避開內設的纜線和管道。 Caution! drilling in the wall. 注意: 不同的裝飾牆面需要不同型號的螺釘。請使用合適的螺釘 Different types of bolts are required for different Note: 和入牆膠塞。...
  • Page 4 2. Drill holes for fixing the bracket and bolt. Using a level to 鑽好掛牆托片櫃體固定孔及台盆懸掛螺栓的安裝孔。使用水 ensure that the hanged bracket is level. 平儀檢查,確保掛牆托片水平。 使用合適的入牆膠塞和螺釘,將掛牆托片和櫃體固定膨脹管 3. Use suitable plugs and bolts, and fix the bracket and bolt on the wall. Fix the bolts supplied with the vanity on the 固定在牆上。配套台盆配件中的懸掛螺栓也固定在牆上,並...
  • Page 5 c. Adjust the cabinet and vanity level. Put the cabinet against 將臉盆櫃和台盆調節到水平狀態,調節吊碼的螺釘,使臉盆 the wall by adjusting the screws of wall clips. 櫃背板緊貼牆壁。 MAX1 Fig.7 圖7 d. Drill holes on the wall according to the holes on the cabinet 按照櫃體後被板上的孔位再次在牆上打孔並埋入膨脹管,最 back board, insert expanding dowels and then fix cabinet 後用配套螺絲將櫃體與牆面再次緊密固定。...
  • Page 6 連接排水管 Connect Drainage a. Inwall drainage (P-Trap) 入牆式排水管(P彎管) Please install the drain assembly and faucet as shown. 請按照如圖所示安裝排水管和龍頭。請遵照供應商所提供的 Please set the water supply and drainage position 說明在牆上設置進/排水管位置。您可以把彎管放入U型缺 according to the suppliers instructions. You can put the 口。 pipe into the U Notch. Faucet 龍頭...
  • Page 7: User Maintenance

    6. Please do not sit, lean or step on the basin cabinet. 日常使用時,請勿坐、倚、靠、踩踏在臉盆櫃上。 7. If any fixtures caused by abnormal reasons, Kohler China 科勒公司確保在擔保期內,可以提供因非正常原因造成的如 can supply paid replacement for service parts caused by 維修零件途中零件的有償更換。...

This manual is also suitable for:

Modern life k-77139tw-s01