Chapter 6
Maintaining the Router
Transferring the Power Modules
Transferring the Blower Module
Note
Transferring the Power Distribution Unit
OL-11497-03
Remove each CSC from its slot in the defective chassis as instructed in the
"Removing a Clock and Scheduler Card" section on page
install the CSC in the same slot of the replacement chassis as instructed in the
"Installing a Clock and Scheduler Card" section on page
Remove each SFC from its slot as instructed in the
Card" section on page
replacement chassis as instructed in the
on page
6-63.
Remove each alarm card from its slot in the defective chassis as instructed in the
"Removing an Alarm Card" section on page
card in the same slot of the replacement chassis as instructed in the
Alarm Card" section on page
For systems equipped with AC-input power supplies, remove each power supply
as instructed in the
"Removing and Replacing an AC PEM" section on page
Immediately install each PEM in the same bay of the replacement chassis.
For systems equipped with DC-input PEMs, remove each PEM as instructed in the
"Removing and Replacing a DC PEM" section on page
each PEM in the same bay of the replacement chassis.
Remove the blower module from the chassis as instructed in the
Replacing the Blower Module" section on page
Set the blower module safely aside temporarily. You will install it on the
replacement chassis in a later procedure.
Follow the instructions in the
page 6-68
to remove the PDU from the defective chassis and install it in the
replacement chassis.
Cisco 12006 and Cisco 12406 Router Installation and Configuration Guide
6-62. Immediately install the SFC in the same slot of the
"Installing a Switch Fabric Card" section
6-66.
"Removing and Installing the Chassis" section on
Removing and Installing the Chassis
6-58. Immediately
6-59.
"Removing a Switch Fabric
6-66. Immediately install the alarm
6-31. Immediately install
"Removing and
6-9.
"Installing an
6-18.
6-73