Page 1
POWER OPERATION ALARM EXPORT LIMIT SETTINGS Three Phase ENTER DOWN Series Fifth Generation POWER OPERATION ALARM ENTER DOWN Series Fifth Generation...
Page 2
Export Limit Instructions S5 Series | Three Phase POWER OPERATION ALARM Press the ENTER button on the interface. 0550W Power : 12:48 21-06-2024 If previously dim, the display will now ENTER brighten. DOWN Series Fifth Generation POWER OPERATION ALARM Press the UP or DOWN buttons to -->...
Page 3
Export Limit Instructions S5 Series | Three Phase POWER OPERATION ALARM Use the UP or DOWN buttons to navigate to the ‘Grid OFF’ option. Grid ON --> Grid OFF Then press ENTER. ENTER DOWN Note: You should see that the operation light turns off.
Page 4
Export Limit Instructions S5 Series | Three Phase Press the UP or DOWN buttons to navigate to ‘Mode Select’ and press POWER OPERATION ALARM ENTER. ON=<ENT> CANCEL=<ESC> Meter in Grid It will appear as ‘OFF’ at first. Press the UP and DOWN buttons to navigate to ENTER ‘Meter in Grid’.
Page 5
Export Limit Instructions S5 Series | Three Phase Stay in ‘Advanced Settings’ by pressing the ESC button two times. POWER OPERATION ALARM --> Grid ON Next, navigate to ‘Grid ON / Grid OFF’ as Grid OFF in Step 4. ENTER Finally, select ‘Grid ON’...
Need help?
Do you have a question about the S5 Series and is the answer not in the manual?
Questions and answers