I
NSTALLATION
Initialization of System
After the air conditioning equipment is installed, turn on the power supply to perform a running inspection.
Be sure to read the operation instructions thoroughly before proceeding with further operation.
e permanent wiring for the air conditioning control box can be connected from the main incoming line of the
RV, which is routed along the side wall, as illustrated in the following gure.
Panel
It's forbidden to insert other plugs into this circuit
A dedicated socket for the air conditioning equipment should be installed on the side wall of the RV.
e cable must be connected to both the socket and the fuse.
e main connecting cable should be resistant to oil, water, and ozone corrosion.
support@pdhvac.com | (800)-675-7410 | https://www.pdhvac.com/support/
I
NSTRUCTIONS
Preventive Wiring (Trunking)
Main Cable
Special Plug
Air Conditioner
Junction Box
29
Need help?
Do you have a question about the PYZ012AZUDCIPD and is the answer not in the manual?