Contents Contents & Nomenclature Specifications Health & Safety Installation Commissioning 8-12 Wiring Diagrams 13-20 Service & Maintenance 21-22 Nomenclature JEH R 0140 B 2 M 1 ① ② ③ ④ ⑤ ⑥ ⑧ ⑦ ① J & E Hall International ⑤...
Specifications Electrical Data COP / (SEPR) Compressor Connections Dimensions Compressor Fan Motors Oil Sep. Coil Liquid Unit Dry SPL @ Airflow Unit Model Charge Volume Receiver Weight Sw ept Unit Mounting Type Liquid Suction Type Volume Charge (W x D x H) x D) (m³/h) (Litres) (Litres)
Health and Safety Installation Unit location Important Note: • In order to achieve maximum cooling capacity, the installation Only qualified personnel, who are familiar with refrigeration location for the condensing unit should be carefully selected. systems and components including all controls, should perform the installation and start-up of the system.
Page 5
Installation Field piping • Tests must be conducted to ensure the amount of off-cycle migration to the compressor does not exceed the compressor’s charge limit. Important Note: • Wherever possible the system should be installed to utilize a pump down configuration. Pipe sizing should only be determined by qualified personnel.
Installation (B.) R407A The correction factor of refrigerant R407A is shown as below table: JEHS0951/1150B4L3EVI Amount of Sub-cooling (K) (Watts) Ta\Te 33.1 32.8 32.4 32.1 31.8 0.73 0.73 0.73 0.73 0.73 38.0 37.0 35.9 34.9 33.8 0.68 0.69 0.69 0.70 0.70 41.0 39.5...
Page 7
Installation Always pressurize the system slowly, preferably in stages up to the Electrical maximum required pressure. Maximum test pressures applicable to the unit are as follows: Important Note: Test pressure High side Low side The mains electrical supply to the condensing unit must be via a suitable motor rated circuit breaker or fuse.
Commissioning Compressor rotalock connections Pre startup checks The rotalock connections as used on some compressor models are Before starting the condensing unit, the following sealed with Loctite 554 thread sealant. The connections should be checks should be carried out as a minimum: leak tested at commissioning and during service/maintenance visits.
Commissioning XGE Fan Speed Controller (Series 2 & 3 & 4 & 6 Units) Safety pressure switch settings The fan speed controller is factory set to 19 bar for operation with The Saginomiya dual pressure switch fitted to all JEH model R4*** series refrigerant to ensure compressor always operates condensing units with auto reset for low pressure and manual within envelope at all declared working condition.
Commissioning Electrical Installation Units with microchannel condenser coils • Do not operate system before all cable connections are Care must be taken during charging a unit with refrigerant when a completed. microchannel condenser coil is fitted. Because the microchannel • Refer to wiring diagram for electrical connections.
Commissioning Digital input Di1/Di2 • The digital input Di1 is the interface between controller EXD-HP1 and system controller if Modbus communication has not been used. • The digital status is dependent to operation of system’s compressor or demand. Operating Condition Digital input status Compressor starts Closed (Start)
Page 12
Commissioning EXD – HP1 Error/ Alarm handling Note: When multiple alarms occur, the highest priority alarm is displayed until being cleared. Then the next highest alarm is displayed until all alarms are cleared. Only then will parameters will be shown again Issue: 01.04.2022 Page 12...
Service & Maintenance Important Note: • Micro channel heat exchangers, because of their fin geometry, tend to retain water more than traditional fin Warning! – Disconnect the mains electrical & tube coils. Depending on the specific design and supply before servicing or opening the unit. installation of your coil, it may be beneficial to blow or vacuum out the rinse water from your unit to speed drying and prevent pooling.