Advertisement

Quick Links

iSHAK US 15
PRODUCT USER MANUAL

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the iSHAK US 15 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Neuation iSHAK US 15

  • Page 1 US 15 PRODUCT USER MANUAL...
  • Page 3: Table Of Contents

    CONTENTS 1. Introduction..............2. Intended Use..............3. Features................4. Technical Specification............. 5. Accessories..............6. Safety Precautions............7. Installation............... 8. Standard Parts Listing............9. User Interface & display........... 10. Optional Attachments........... 11. Maintenance & Cleaning..........12. Operation..............13. Warranty Statement............. 14.
  • Page 4: Introduction

    1. INTRODUCTION This manual provides important safety information for this Platform Shaker. It should be kept near the equipment for quick & easy reference. This platform shaker allows the shaking ( Orbital / Linear motion) of liquids & semi-liquids up to a maximum weight of 15 Kg. It supports various attachments for mixing liquids in flasks and beakers.
  • Page 5: Technical Specification

    3. FETAURES · Last run memory feature allows easy repeatability in tests 4. TECHNICAL SPECIFICATION Motor Type BLDC motor Variable Speed 50 to 300 RPM Orbital/Linear Motion 30 mm to 70 mm diameter Run Time 0 min to 99.59 hours Digital display Maximum allowable Weight 15 kg (Including Attachment) Platform size (LxW)
  • Page 6: Accessories

    5. ACCESSORIES · Attachments (Optional) · Power adapter, Spanner · Product user Manual & Warranty card 6. SAFETY PRECAUTIONS Read the following safety instructions before using the shaker for your safety & the safety of the equipment. • Do not load more than 15 Kg of weight •...
  • Page 7 6. SAFETY PRECAUTIONS • If you notice that the device is not working smoothly then reduce the speed or load till it has a smooth operation. • In case there is an interruption in power supply during operation, the instrument will not start automatically again when power supply restore.
  • Page 8: Installation

    7. INSTALLATION This smart platform shaker is supplied in a box. Open the box, then remove the packaging and gently place the device on the firm & leveled surface. Take care while unpacking & removing all accessories. The user manual should be kept with the device for easy access.
  • Page 9 7. INSTALLATION 7.3 MOUNTING Place the instrument on a flat and leveled surface; ensure that the four feet of this shaker stand on the surface firmly. Avoid installing on a slippery surface or surface prone to vibration. If the mounting surface is uneven, adjust the appropriate base mount of the instrument by moving downward or upward.
  • Page 10: Standard Parts Listing

    8. STANDARD PARTS LISTING Clamping screw Shaking Platform Control Panel Adjustable Base Mount Power ON/OFF Port Switch...
  • Page 11: User Interface & Display

    9. USER INTERFACE AND DISPLAY Speed Section Speed button, Speed value display and CW/CCW direction selection LED. • Press Speed button to select and set speed value. • Clockwise and counter-clockwise LED allows the user to select the direction of the rotation. Press SPEED button to select speed with CW direction of rotation.
  • Page 12 9. USER INTERFACE AND DISPLAY Program Mode Section Program (P) button, Sub-Program (S) button, Loop button and its corresponding display. • Long Press Program button (P) to enter or exit from program mode • Single Press Program button (P) to select programs. • Single Press Sub-Program Button (S) to select Sub-Programs. •...
  • Page 13: Optional Attachments

    10. OPTIONAL ATTACHMENTS Optional attachments are used for shaking of liquids in flasks & beakers. All these attachments easily get placed and tighten on the shaking platform. Below are the optional attachments with its name and usage. Universal Attachment SS Clamps Attachment Plastic Clamps Attachment Funnel Attachment...
  • Page 14 10. ATTACHMENTS INSTALLATION 10.1 Installing & Removing Universal Attachment All attachments must be firmly placed on the shaking platform. Make sure that unit is OFF while you place the attachment on the platform. Properly hold the attachment with both the hands and place it on the shaking platform. Guide all four (4) holding bracket in such a way that it placed on the respective clamping screws.
  • Page 15: Maintenance & Cleaning

    10. SUPPORTING WEIGHT ON ATTACHMENTS In order to ensure safe and secure operation, the shaking platform must only be operated within the range of usable weight and speed (see diagram). Please make certain that the platform surface on which the attachment is placed is clean and leveled. If the attachment is screwed together with an adjacent piece of equipment (i.e.
  • Page 16: Operation

    12. OPERATION 11.1 SETTING TIME Single press “Time Button” to select Time value. On 1st press, the “Minutes” value will be selected and on the second time, the “Hours” value will be selected. Minutes and Hours value will toggle on each press. Once the required value is selected, use increment and Decrement buttons to modify and set the new time.
  • Page 17 12. OPERATION Program mode Flow chart. Each Program has 9 different Sub-Programs and all 9 sub programs can have different speed and time values. Looping of each program can be done using Loop Button. S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 S1 S2 ..
  • Page 18 12. OPERATION Single Press Program Button “P” to select program. Program value will start blinking and the user can use increment or decrement button to select any program from available 6 programs. Single Press Single Press Single Press Sub-Program Button “S” to select sub-program. The sub-program value will start blinking and the user can use increment or decrement button to select any sub-program from available 9 programs.
  • Page 19 12. OPERATION Press “Loop Button” to make the loop of sub-programs. The display will shows “SL” indicating Loop is selected. The user can set total time of Loop by press “Time Button”. Single Press Single Press Single Press The above image shows that the loop of Program 3 “P3” is created and that loop will go on for 3 hours.
  • Page 20: Warranty Statement

    13. WARRANTY STATEMENT This product is warranted to be free from defects in material and workmanship. Your product will be duly repaired upon prompt notification in compliance with the following conditions: This warranty is valid only if the product is used for its intended purpose and within the guidelines specified in this instruction manual.
  • Page 21 13. WARRANTY STATEMENT The purchaser agrees that there is no warranty of merchantability or of fitness for any intended purpose and that there are no other remedies or warranties, expressed or implied, which extend beyond the description on the face of the agreement. This warranty is only applicable to the original purchaser.
  • Page 22: Product Disposal

    14. PRODUCT DISPOSAL In case the product is to be disposed of, the relevant legal regulations are to be observed. Information on the disposal of electrical and electronic devices in the European Community The disposal of electrical devices is regulated within the European Community by national regulations based on EU Directive 2012/19/EU on waste electrical and electronic equipment (WEEE).
  • Page 24 Accumax Lab Devices Private Limited Plot No. 15, 16 & 32 GIDC Electronic Park SEZ, Sector 26, Gandhinagar, Gujarat, India - 382026. Website: www.accumaxlab.com...

Table of Contents