Copyright © Huawei Digital Power Technologies Co., Ltd. 2025. All rights reserved.
Installation Preparation
• Before installing the equipment, read the product documentation carefully to get familiar with
product information and safety precautions. Equipment damage caused by failure to abide by
the storage, transportation, installation, and operation guidelines specified in the product
documentation is not covered by the product warranty. Log in to the technical support website
to view the product documentation and safety precautions.
• The information in this document is subject to change without notice. Every effort has been
made in the preparation of this document to ensure accuracy of the contents, but all
statements, information, and recommendations in this document do not constitute a warranty
of any kind, express or implied.
• Only qualified personnel are allowed to perform operations on the equipment. Operation
personnel should understand the system, its working principles, and relevant national/regional
standards.
• Wear dedicated personal protective equipment during operations. Use dedicated insulated tools
during electrical operations.
Environment requirements
310 kg
Operating
Relative humidity
Airtight
Floor and support
temperature
0%–95% RH
equipment
load capacity
(non-condensing)
0–40°C
room
Heat source,
Dust or
Water source,
inflammable or
Direct sunlight
conductive
water vapor
explosive article
metal dust
Clearance
Unit: mm
Recommended Circuit Breaker Specifications for
a 380 V AC/400 V AC/415 V AC Voltage System
When the Short-circuit Current Going Through the Device
Capacity
Mains Input
120 kVA
250 A/3P
90 kVA
200 A/3P
60 kVA
125 A/3P
30 kVA
63 A/3P
Recommended Cable Specifications for
a 380 V AC/400 V AC/415 V AC Voltage System (mm
Capacity
Mains Input
L1: 95
L2: 95
L3: 95
120 kVA
N: 95
PE: 50
L1: 70
L2: 70
L3: 70
90 kVA
N: 70
PE: 35
Excessive
L1: 35
salt content
L2: 35
L3: 35
60 kVA
N: 35
PE: 16
L1: 10
L2: 10
Volatile or
L3: 10
30 kVA
corrosive
substance
N: 10
PE: 10
Is Less than 36 kA
Maintenance
Bypass Input
Output
Bypass
(Single UPS)
250 A/3P
250 A/3P
250 A/3P
200 A/3P
200 A/3P
200 A/3P
125 A/3P
125 A/3P
125 A/3P
63 A/3P
63 A/3P
63 A/3P
2
)
Equipotential
Bypass Input
Output
Battery Input
Ground
L1: 70
U: 70
+: 95
L2: 70
V: 70
N: 95
L3: 70
W: 70
GND: 16
–: 95
N: 70
N: 70
PE: 50
PE: 35
PE: 35
L1: 50
U: 50
+: 70
L2: 50
V: 50
N: 70
L3: 50
W: 50
GND: 16
–: 70
N: 50
N: 50
PE: 35
PE: 25
PE: 25
L1: 25
U: 25
+: 50
L2: 25
V: 25
N: 50
L3: 25
W: 25
GND: 16
–: 50
N: 25
N: 25
PE: 25
PE: 16
PE: 16
L1: 10
U: 10
+: 16
L2: 10
V: 10
N: 16
L3: 10
W: 10
GND: 16
–: 16
N: 10
N: 10
PE: 16
PE: 10
PE: 10
1
Installing a Cabinet
Secured Installation
1
Determine the UPS cabinet installation position. Draw mounting holes in the
installation position according to the drawing.
Unit: mm
2
Drill holes in the mounting holes using a hammer drill, and install expansion bolts
in the holes.
M12 bolt
Spring washer
Flat washer
Concrete floor
Expansion sleeve
Expansion nut
3
Move the cabinet to the installation position. Remove the rear panel of the
cabinet, and then open the front door.

Advertisement

loading
Need help?

Need help?

Do you have a question about the UPS5000-E-120K-FX and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Huawei UPS5000-E-120K-FX

  • Page 1 Date: 2024-01-15 120 kVA 250 A/3P 250 A/3P 250 A/3P 250 A/3P Spring washer Copyright © Huawei Digital Power Technologies Co., Ltd. 2025. All rights reserved. Flat washer 90 kVA 200 A/3P 200 A/3P 200 A/3P 200 A/3P Installation Preparation...
  • Page 2 Remove the four plugs from the bottom of the cabinet (two at the front and two Installing Cables Install the ground cable. at the rear). • The number and colors of cables are for reference only. • Cables of the same group, for example, mains input cables (1L1, 1L2, 1L3, and N), must be routed through the same cable hole.
  • Page 3 One End The Other End Connect power cables. Cable Type No. Protocol Component Port Port Component Power grid Power grid Load PDF mains input circuit Wiring breaker Mains Bypass terminal Output input input switch Flat switch switch Bolt PDF N bar washer PDF PE bar Spring...
  • Page 4 (Full configuration model) Turn on the UPS bypass input switch, mains input switch, and output switch. Maintenance bypass Load Bypass Desiccant Huawei Digital Power Technologies Co., Ltd. Mains + – Huawei Digital Power Antuoshan Headquarters, Futian District, Shenzhen Battery 518043 www.huawei.com...