Brooks Instrument Quantim QMC Series Installation & Operation Manual

Mass flow controllers & meters
Hide thumbs Also See for Quantim QMC Series:

Advertisement

Quick Links

Installation & Operation Manual
Quantim
QMC Series
®
Mass Flow Controllers & Meters

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Quantim QMC Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Brooks Instrument Quantim QMC Series

  • Page 1 Installation & Operation Manual Quantim QMC Series ® Mass Flow Controllers & Meters...
  • Page 2: Essential Instructions

    Read before proceeding! Brooks Instrument designs, manufactures and tests its products to meet many national and international standards. These products must be properly installed, operated and maintained to ensure they continue to operate within their normal specifications. The following instructions must be adhered to and integrated into your safety program when installing, operating and maintaining Brooks Instrument products.
  • Page 3 Brooks Instrument Quick Start Guide Step 2: Mounting the Quantim Step 1: Location/Orientation The instrument may be located anywhere in the process line, as long as the following conditions are met: • Before operation, you must be able to stop flow through the meter. During the zeroing procedure, flow must be stopped completely, and the flow meter sensor tube must be full of process fluid to achieve an accurate zero. • During operation, the flow sensor tube must be full of process fluid. • Ambient temperature must remain between 0° and 60°C (32°F and 140°F).
  • Page 4 Brooks Instrument Quick Start Guide Step 3A: Electrical Connections Step 3B: Electrical Connections Meter/Controller IP40 Meter/Controller IP66 or Class 1 Division 2 / Zone 2 D-Connector Functions Legends: 3-B1 • = Feature Available N/A = Not Available NOTE: Chassis ground is available through the D-Connector back shell. 3-A1 D-Connector for QmC IP40...
  • Page 5 Brooks Instrument Quick Start Guide Step 4: Zeroing Procedure To assure measurement accuracy, the instrument must be zeroed to the operational installation conditions: • Apply power to instrument for approximately 45 minutes to reach a stable thermal condition prior to applying flow. • Flow the process fluid into the instrument and allow sufficient time for the sensor to reach normal operating temperature.
  • Page 6: Table Of Contents

    Brooks Instrument Contents Quick Start Instructions Quick Start Instructions Location / Orientation and Mounting ...........QS-1 Quick Start Instructions Electrical Connections .................QS-2 Quick Start Instructions Zeroing Procedure and Operations .............QS-3 Quick Start Instructions Equipment Receipt and Return ............QS-3 Quick Start Instructions Warning and Caution ................QS-3 Section 1 Introduction How to Use This Manual ......................... 1 Description ............................1 Performance Specifications ......................2 Dimensions ............................5 Section 2 Installation General ............................7 Receipt of Equipment ........................7 Recommended Storage Practice .....................
  • Page 7 Brooks Instrument Contents Figures 1-1 Dimensional Drawing QMC IP40 ....................5 1-2 Dimensional Drawing QMC IP6x / Class 1 Division 2 Zone 2 ........... 5 1-3 Dimensional Drawing QMC Bottom View .................. 6 1-4 Lay-In Dimensions Integral Valve ....................6 1-5 D-Connector Electrical Pin Connections ................... 6 1-6 Terminal Block Pinout Connections for IP66 or Class 1 Division 2 / Zone 2 ......6 2-1 Flow Direction Through the Quantim, as Indicated by the Arrow Engraved on the Meter/Controller Body ................
  • Page 8: Section 1 Introduction

    Brooks Instrument Section 1 Introduction How to Use This Manual It is recommended to read this manual before installing, operating or troubleshooting your Quantim QMC Series Mass Flow Meter or Controller. ® This manual is organized into the following sections: Section 1.
  • Page 9: Performance Specifications

    Brooks Instrument Section 1 Introduction Performance Specifications Table 1-1 Product Specifications QMCC (Controller) QMCM (Meter) Performance Tube Size: Nominal Flow Range Liquid (kg/hr): 0.15 0.78 7.97 0.19 1.30 13.50 Gas (kg/hr): 0.076 0.214 1.796 0.103 0.53 3.840 Gas (sccm) 1051...
  • Page 10 Brooks Instrument Section 1 Introduction Table 1-1 Product Specifications (Contin.) QMCC (Controller) QMCM (Meter) Diagnostics Status Lights: Status and Alarm LEDs Mass Flow, Density, Volumetric Flow, Temperature, Slug Flow, Alarms: Diagnostic Failure, Setpoint Deviation, Valve Drive Electrical Digital: RS485 S-Protocol (See RS485 Supplemental Manual – QMC for additional details)
  • Page 11 Brooks Instrument Section 1 Introduction Notes The nominal flow rate is the flow rate at which water at reference conditions causes approximately 1 bar of pressure drop or the laminar to turbulent transition flow whichever is lower. Maximum flow rate is higher than the nominal flow rate and is dependent upon process fluid and process conditions.
  • Page 12: Dimensions

    ED IN WHOLE OR IN PART FORANY GG99/J RPOSE OTHER THAN FOR EVALUATION, PROVIDED THAT, IF A EVALUATION, PROVIDED THAT, IF A NTRACT IS AWARDED TO BROOKS INSTRUMENT LLC, AS A BROOKS INSTRUMENT LLC, AS A 1/8" VCR 1/8" VCR 5.92 [150.37]...
  • Page 13: Dimensional Drawing Qmc Bottom View

    "X" 7.00 177.80 Brooks Instrument Section 1 Introduction 4.08 6.17 103.51 14.83 M6X1.0 - 6H .47 11.99 TYP 11.44 MOUNTING PLATE REMOVED Figure 1-3 Dimensional Drawing QMC Bottom View "W" DIMENSION "X" DIMENSION "Y" DIMENSION "Z" DIMENSION FITTING (NO FILTER)
  • Page 14: Section 2 Installation

    Brooks Instrument Section 2 Installation General WARNING Operating Procedure: Do not operate this instrument outside the specifications listed in Section 1. Before bringing the unit into operation, make sure that all fluid connections have been correctly tightened and that all necessary electrical connections have been made.
  • Page 15: Transit Precautions

    Brooks Instrument Section 2 Installation Transit Precautions To safeguard against damage during transit, transport the instrument to the installation site in the same container used for transportation from the factory if circumstances permit. Fluid Connections General Mounting Practices Use good piping practices to minimize transmitting any torque or bending loads onto the process connections on Quantim . Always verify there are no leaks prior to starting Quantim...
  • Page 16 Brooks Instrument Section 2 Installation Recommended installation procedures: a. All models should be mounted to a stable surface that is relatively free from mechanical shocks and mechanical vibration using the supplied mounting plate. b. Leave sufficient room for access to the electrical connections. c. Install in a manner that allows the instrument to be easily removed. d. Install the instrument with an appropriate filter on the fluid inlet side. e. It is recommended that a positive shutoff valve be installed downstream of the Quantim ® to allow for proper zeroing after installation. CAUTION The control valve of the Quantim Mass Flow Controller provides precision control and is not designed for positive shutoff. If...
  • Page 17: Process Mounting

    Brooks Instrument Section 2 Installation Process Mounting Quantim will function in any orientation if the Coriolis sensor and the control valve remain filled ® with process fluid. Entrapped gas in a liquid application and entrapped liquid in a gas application should be prevented as it may disturb the Coriolis sensor and the control valve. Install Quantim ® considering the direction of the FLOW arrow. The arrow indicating proper flow direction is engraved on the instrument between the process fittings. (See Figure 2-1 below.) Figure 2-1 Flow Direction Through the Quantim, as Indicated by the Arrow Engraved on the Meter/Controller Body. Horizontal Mounting If installing Quantim in a horizontal orientation, liquids should flow in the direction of the flow arrow. ® Situations of entrapped gas in the liquid process should be avoided. In liquid flow applications, it is...
  • Page 18: Vertical Mounting

    Brooks Instrument Section 2 Installation Figure 2-3 Horizontal Right Side Up Installation Vertical Mounting If Quantim is installed in a vertical orientation, for use in a liquid application, liquid should flow ® upwards through the instrument to help minimize errors due to entrapped gas (See Figure 2-4). For gas flow vertical orientation, flow up or down is acceptable. Figure 2-4 Vertical Flow Up Installation Installation Manual for Quantim ®...
  • Page 19: Electrical Interfacing

    Brooks Instrument Section 2 Installation Electrical Interfacing Meter and Controller Flow Output (IP40: Pins 2, 4 and 10 or IP6x: J4-6, J4-4 and J4-1) Flow Output configuration is a factory selected option. Each Quantim instrument is calibrated as either 0-5 (10) Vdc or (0) 4-20 mA at the factory as ®...
  • Page 20: Electrical Interfacing For Quantim Qmc Ip40

    Brooks Instrument Section 2 Installation Secondary Output, Density or Temperature (IP40: Pin 13 and Pin 10 or IP6x: J4-3 and J4-1) Pin 13 (J4-3) indicates the density or temperature, represented by a (0) 4-20 mA or 0-5 (10) Vdc signal, proportional to density or temperature. The current and voltage signals are returned via Pin 10 (J4-1). Maximum series resistance on Pin 13 (J4-3) is 500 ohms when configured for (0)
  • Page 21: Electrical Interfacing For Quantim Qmc Ip6X

    Brooks Instrument Section 2 Installation Table 2-2 Electrical Interfacing for Quantim QMC IP6x Pin IP6x Signal Connector Power Supply (14-27 V) Power Common Earth GND RS-485, B(-) Input / Output RS-485, A(+) Input / Output Setpoint Common Valve Override Input Setpoint Input, Current...
  • Page 22: General Wiring

    Brooks Instrument Section 2 Installation RS485 (S-Protocol) Communication Quantim Model QMC is equipped with RS485 communication capability. Refer to Figure ® 2-1 for IP40 or Figure 2-2 for IP6x, Electrical Interfacing for Quantim, to enable the device to communicate via a personal computer, PLC or DCS for process control. Baud rate selections for Quantim with RS485 are: 1200, 2400, 4800, 9600, 19200 and 38400 baud. The device is factory ® set with a baud rate of 19200 and can be changed using the Brooks Expert Support Tool (BEST). The RS485 is a multidrop connection which allows a maximum of 32 devices to be connected to a personal computer or control system. Personal computers are not equipped with RS485 ports as standard. An RS232/USB to RS485 converter or RS485 interface board is therefore required...
  • Page 23: Interconnection With Peripheral Equipment

    Brooks Instrument Section 2 Installation Interconnection with Peripheral Equipment The following cables are available for connection of Quantim Model QMC IP40 Meters and ® Controllers with 15 pin D connector to the Brooks Instrument Microprocessor Control & Read-out Unit: Models # 0152, 0154, 0251 or 0254 Length: 3ft (1m); part number 124Y054AAA Length: 5ft (1.5m); part number 124Y050AAA Length: 10ft (3m); part number 124Y051AAA Length: 25ft (7m);...
  • Page 24 Brooks Instrument Section 2 Installation QMC IP40 D-CON PIN Color Function Controller Meter Setpoint Common 0-5 (10) Volt Flow Output (TTL) Open Collector Alarm Output (0) 4-20 mA Flow Output Power Supply (14-27 V) BLUE Not Connected WHT/BLK (0) 4-20 mA Setpoint Input...
  • Page 25: Section 3 Operation

    Brooks Instrument Section 3 Operation Operating Procedure CAUTION Any sudden change in system pressure may cause mechanical damage to elastomer materials. Damage can occur when there is a rapid expansion of fluid that has permeated elastomer materials. The user must take the necessary precautions to avoid such conditions.
  • Page 26: Zero Procedure

    Brooks Instrument Section 3 Operation After Quantim has been fully installed, you must perform the zeroing procedure. This procedure ® ensures that the instrument responds properly to zero flow condition and sets a baseline for flow. To perform the zeroing operation on the meter/controller, use the ZERO button, which is located on top right hand side (outlet side) of the instrument. Zero button must be pressed for at least 3 seconds to initiate zeroing procedure. Care should be taken when exercising the zero button. Ensure alignment of the tool on the zero button. Apply a small force to depress the button.
  • Page 27: Calibration Procedure

    Brooks Instrument Section 3 Operation CAUTION Flow through the instrument during zeroing procedure will result in an inaccurate zero setting. Make sure fluid flow through the instrument is completely stopped during the zeroing procedure. 4. After confirming that fluid flow through the instrument is completely stopped, actuate the zero function as previously stated. Care should be taken when exercising the zero button. Ensure alignment of the tool on the zero button. Apply a small force to depress the button.
  • Page 28: General

    Brooks Instrument Section 4 Maintenance & Troubleshooting General There are no routine maintenance procedures required to keep your Quantim instrument in good ® operating condition. It is however, very important to keep the fluid entering Quantim clean, and as a ® result periodic replacement of the inlet guard filter is recommended at a frequency determined by the cleanliness of the fluid. At a minimum this guard filter should be replaced annually. WARNING Products in this manual may contain metal or elastomeric seals, gaskets, O-rings or valve seats. It is the "user's" responsibility to select materials that are corrosion resistant and compatible with their process and process conditions.
  • Page 29: Maintenance & Troubleshooting

    Brooks Instrument Section 4 Maintenance & Troubleshooting Maintenance & Troubleshooting System Checks WARNING Internal seals and component alignments are extremely critical within the device. Improper servicing of your Quantim can cause malfunction of the device and/or personal injury. This device must be serviced by factory personnel only.
  • Page 30 Valve out of adjustment. Adjust pressure to original Unstable inlet pressure. Contact Brooks Instrument. Defective PC board. Check external pressure regulator. Valves are tuned digitally and mechanically for a particular P. Contact Brooks Instrument.
  • Page 31 Brooks Instrument Section 4 Maintenance & Troubleshooting Table 4-1 Maintenance & Troubleshooting (continued) Observation Cause Resolution Installation Manual for Quantim ®...
  • Page 32: Bench Troubleshooting

    Brooks Instrument Section 4 Maintenance & Troubleshooting Bench Troubleshooting WARNING If it becomes necessary to remove the instrument from the system power to the device is disconnected at the power supply. WARNING If it becomes necessary to remove the instrument from the system...
  • Page 33: Bench Troubleshooting Circuit

    Brooks Instrument Section 4 Maintenance & Troubleshooting 5. Verify that the electrical output signal reaches 100% of flow. For MFC applications vary the setpoint over the 1% to 100% range and verify that the output signal matches the setpoint. If possible, connect a flow measurement device (such as a rotometer) to the Quantim outlet to monitor the actual flow behavior. 6. If the Quantim is functioning correctly, the problem may lie elsewhere in the flow system. Re- verify the installation as well as the upstream/downstream fluid system configuration. 7. Please contact Brooks Instrument for further assistance visit our website www.brooksinstrument.com/en/service-support/contact-technical-services. Figure 4-1 Bench Troubleshooting Circuit Installation Manual for Quantim ®...
  • Page 34 LIMITED WARRANTY Visit www.BrooksInstrument.com for the terms and conditions of our limited warranty. BROOKS SERVICE AND SUPPORT Brooks is committed to assuring all of our customers receive the ideal flow solution for their application, along with outstanding service and support to back it up. We operate first class repair facilities located around the world to provide rapid response and support. Each location utilizes primary standard calibration equipment to ensure accuracy and reliability for repairs and recalibration and is certified by our local Weights and Measures Authorities and traceable to the relevant International Standards. Visit www.BrooksInstrument.com to locate the service location nearest to you. START-UP SERVICE AND IN-SITU CALIBRATION Brooks Instrument can provide start-up service prior to operation when required. For some process applications, where ISO-9001 Quality Certification is important, it is mandatory to verify and/ or (re)calibrate the products periodically. In many cases this service can be provided under in-situ conditions, and the results will be traceable to the relevant international quality standards. SEMINARS AND TRAINING Brooks Instrument can provide seminars and dedicated training to engineers, end users and maintenance persons. Please contact your nearest sales representative for more details. Due to Brooks Instrument's commitment to continuous improvement of our products, all specifications are subject to change without notice.

This manual is also suitable for:

Quantim qmcmQuantim qmcc

Table of Contents