1. DISASSEMBLY
1.1
PARTS REPLACEMENT CAUTIONS
(see Exploded View)
1. When installing the gear unit assembly
60) , observe
that lock lever A, which presses the take-up guide pole
, enters slit B of the adapter frame Q).
2. Do not disassemble the gear unit assembly
3
3. Use special care when handling the take-up guide pole
lever
27), supply guide pole lever
and the gear
unit
assembly
60) , since these
are particularly
vital
sections.
1.3.
CIRCUIT DIAGRAM
LOADING
END SW
LOADING
UNLOADING
UNLOADING
END
SW
LOADING
MOTOR
Fig. 1
—~—~=—
UNLOADING
LOADING
1.2
GUIDE POLE INCLINATION
1. Guide pole inclination
1) Without
inserting a cassette, close the cassette door
and press the cassette lever
to initiate the
loading operation.
2) Open the front lid
and observe the take-up and
supply guide poles. These should
be pressed against
the adapter frame by the pole lock lever.
2. Confirm operation
1) After
reassembly,
load a VHS-C
tape and insert in
a VHS video cassette recorder.
2) Operate
all transport
modes
(Play,
Fast Forward,
Rewind,
Pause,
etc.)
several
times
and
confirm
stable operation and absence of damage to the tape.
DOOR
SW
BATTERY
UNLOADING=«—»
LOADING
CASSETTE
Ye
Need help?
Do you have a question about the C-P3 and is the answer not in the manual?