Cisco Catalyst WS-C2924-XL Hardware Installation Manual page 71

Catalyst 2900 series xl hardware installation guide
Hide thumbs Also See for Catalyst WS-C2924-XL:
Table of Contents

Advertisement

Chapter 2
Installation
Figure 2-17 Removing the Ground-Lug Screws
C O N SO
LE
Step 2
Step 3
Step 4
Step 5
78-6461-04
RE FE R
TO M AN
BE FO RE
UA L
CO NN
EC TI NG
PO W ER
Set the screws and the ground lug aside.
If your ground wire is insulated, use a wire-stripping tool to strip the 6-gauge
ground wire to 0.5 inch (12.7 mm) ± 0.05 inch (1.27 mm) as shown in
Figure 2-18 Stripping the Ground-Lug Wires
0.5" (12.7 mm) ± 0.05" (1.27 mm)
Insulation
Slide the open end of the ground lug over the exposed area of the 6-gauge wire.
Using a Panduit crimping tool, crimp the ground lug to the 6-gauge wire. (See
Figure
2-19.)
IN PU T:
36 - 72
CU RR
EN T: 4-
2A
A
B
+
-
+
-
D C IN PU
T
Wire lead
Catalyst 2900 Series XL Hardware Installation Guide
Connecting to DC Power
Figure
2-18:
2-27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents