Chapter 2
Installation
Connecting to DC Power
Figure 2-25 Torquing the Terminal-Block Captive Screws
Torque to 4.5 lbf-in. (72 ozf-in.)
Repeat Steps 4 and 5 for the remaining three DC-input power source wires.
Step 6
Figure 2-26
shows the completed wiring of a terminal block plug.
Catalyst 2900 Series XL Hardware Installation Guide
2-33