Powering On The Switch And Running Post - Cisco Catalyst WS-C2924-XL Hardware Installation Manual

Catalyst 2900 series xl hardware installation guide
Hide thumbs Also See for Catalyst WS-C2924-XL:
Table of Contents

Advertisement

Powering On the Switch and Running POST

Figure 2-16 Mounting a Modular Switch to a Wall
Vertical
wall stud
Vertical wall-mount
Powering On the Switch and Running POST
Step 1
Step 2
Catalyst 2900 Series XL Hardware Installation Guide
2-24
User-supplied
User-supplied
screws
After the switch is mounted on the wall, power the switch as described in
"Powering On the Switch and Running POST" section on page
To power on the switch after you install it, follow these steps:
Connect one end of the AC power cord to the AC power connector on the switch.
Connect the other end of the power cord to an AC power outlet.
As the switch powers on, it begins POST, a series of eight tests that run
automatically to ensure that the switch functions properly. When the switch
begins POST, the port LEDs turn amber for 2 seconds, and then they turn green.
screws
Parallel wall-mount
Chapter 2
Installation
2-24.
78-6461-04

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents