Mounting the Base
The base can be mounted on either a horizontal or vertical
surface. The cable can be routed through either the top or the
bottom of the base.
Routing the Cable
The cable can be routed down through the bottom of the base,
securing the cable in the wireway.
The cable can also be routed up through the top of the base but
must be crossed over and secured in the wireway.
Note: When routing the cable up through the top of the base, be
sure to cross the cable over before placing in the wireway.
If not, too much strain is placed on the cable connector.
3
Need help?
Do you have a question about the COB02 and is the answer not in the manual?
Questions and answers