Maintenance And Cleaning - Kenmore K90-75 Owner's Manual

Gas-fired, direct vent, condensing, hot water boiler
Hide thumbs Also See for K90-75:
Table of Contents
Maintenance as outlined below can be performed by the
owner unless otherwise noted.
Th e acidic nature of fl ue gasses condensing on the aluminum boiler
sections will cause the formation of aluminum oxide. Th is oxide
formation is normal, is generally uniform throughout the boiler
sections, and represents a negligible mass of aluminum that is
consumed by oxidation during the life of the boiler. If left unchecked,
this buildup may eventually cause blockage of the fl ue gas passages
in the boiler sections, reducing effi ciency, and ultimately shutting
down the boiler due to lack of combustion air fl ow. Regular service
and maintenance by a qualifi ed service agency must be performed to
assure safe trouble free operation and maximum effi ciency.
Beginning Of Each Heating Season
1.
Annual service call by a qualifi ed service agency, which
includes:
A.
Examine fl ue passages between boiler sections, burner,
and condensate lines, and clean if necessary following
the annual examination and cleaning instructions in para
graph "F" on the next page.
B.
Visually inspect venting and air intake system for proper
function, deterioration or leakage. If the vent or air intake
show any signs of deterioration or leakage, repair or replace
them, immediately. Insure proper reassembly and resealing
of the vent and air intake system
C.
Check for and remove any obstruction to the fl ow of
combustion air or venting of fl ue gases. Check the air baffl e
located inside 1½" x 2" fl exible coupling on the mixer,
clean it if necessary and make sure to put it back. Refer to
repair parts diagram of mixer and pressure switch assembly
for exact location.
D.
Follow instructions for "PLACING BOILER IN
OPERATION".
E.
Follow instructions for" CHECK OUT PROCEDURE
AND ADJUSTMENTS".
F.
Visually inspect condensate drain line for proper operation
and deterioration. Check for plugged condensate drain
line.
G.
Check the silicone rubber seals between boiler sections.
Insure that there are no leaks. Use RTV silicone rubber
adhesive sealant (available in caulking gun tubes) rated for
at least 400° F to replace or repair seals in locations where
original seals have deteriorated.
H.
Check all gasketed joints for leakage, and tighten bolts or
replace gaskets if necessary.
I.
Remove jacket front and top panels and check for piping
leaks around relief valve and other fi ttings. Repair, if found.
DO NOT use stop leak compounds.

MAINTENANCE AND CLEANING

2.
Check that boiler area is free from combustible materials,
gasoline, and other fl ammable vapors and liquids.
3.
Circulator pump and blower motor furnished with boiler are
permanently lubricated from factory and require no further
lubrication. Additional or non-factory supplied pumps and/
or motors should be lubricated according to the pump and/or
motor manufacturer's instruction.
Daily During Heating Season
1.
Check for and remove any obstruction to the fl ow of
combustion air or venting of fl ue gases.
2.
Check that boiler area is free from combustible materials,
gasoline, and other fl ammable vapors and liquids.
41
Table of Contents
loading
Need help?

Need help?

Do you have a question about the K90-75 and is the answer not in the manual?

This manual is also suitable for:

K90-50K90-100

Table of Contents