Page 2
DESCRIPTION Grill Box Upper Post Lower Post Hexa Bolt M10x25 Flat Washer 10 Spring Washer 10 Hexa Nut M10...
Page 3
A. Connect Upper Post to Lower Post - Screw Upper Post (2) onto Lower Post (3), and tighten. B. Foundation Work - Use a post hole digger to dig a hole with minimum diameter of 12” by 30” deep, and fill the hole with concrete.
Page 4
C. Installing Grill Box on Post - Make sure that the concrete holding the Post is fully cured. Align the bottom bracket holes of Grill Box (1) with flange holes of the Upper Post (2) at Post top. Lock the Grill Box (1) by using Hexa Bolt M10x25 (4), Flat Washer 10 (5), Spring Washer 10 (6) and Hexa Nut M10 (7).
Page 5
(both economic and non-economic), and losses of any type, which may occur, and you fully and forever release and discharge Titan, its insurers, employees, officers, directors, associates, and agents from any and all claims, demands, damages, rights of action, or causes of action, present or future, whether the same be known or unknown, anticipated, or unanticipated, resulting from or arising out of the use of said equipment.
Need help?
Do you have a question about the PKGR2v2 and is the answer not in the manual?
Questions and answers