Installation Procedures - Haier HPU-48HV03 Operation And Installation Manual

Cabinet type air conditioner
Hide thumbs Also See for HPU-48HV03:
Table of Contents

Advertisement

Installation procedures

Display of whole unit
Try to bring the packed unit to the installation place.
When it is inevitable to unpack the unit, be careful not to damage the unit. Wrap it with
nylon etc.
After unpacking, be sure to put it with the front side of the unit facing up.
Note: When delivering, don't hold plastic
parts like inlet and outlet grill etc.
Installation of outdoor unit
Selection of installation place
Place strong enough to support the unit and will
not cause vibration and noise.
Place where discharged wind and noise doesn't
cause a nuisance to the neighbors.
Place where is less affected by rain or direct
sunlight and is sufficiently ventilated, or to install
a shield.
Place with enough space for smooth air flow.
Fixing of the unit
Fix outdoor unit using M10 bolt to concrete floor horizontally.
If installed on the wall or on top of a roof, bracket should be fixed securely to
resist earthquake or storms.
Use rubber pad during installation against unit vibration.
190
Installation dimension of outdoor unit (mm)
22
Delivery
over 10cm
580
190
Facing up
over 30cm
over 10cm
over 15cm
over 60cm

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hpu-42cv03Hpu-42hv03Hpu-48cv03

Table of Contents