Page 2
Upper Landing Gate Ensure to have solid beams on each side of the gate to properly secure it. Below is the space required. For instance, a 36" wide gate requires 44 1/4" (see highlight). 44 1/4" Protection Wall Smooth surface without pinch points from the ground to the first level and must extend 12’’...
Page 3
Concrete Slab 7’ L x 5’ W x 6’’ D Minimum of 25 MPA/ 3625 PSI to support 1500 lbs loads. May need to be winterized depending on location. Lifting Height Confirm height from concrete pad to 1st floor. LIFTING HEIGHT IMPORTANT: ALL WORK AND MATERIALS MUST COMPLY WITH ALL LOCAL LAWS AND REGULATIONS.
Page 4
I hereby certify that the information provided on this form is true and accurate. Any discrepancies that require the install crew to delay or leave the job site will incur a minimum $1,500 redeployment fee (Travel expenses will be extra) and must be paid in advance. Signature: ________________________________________________________________ Date: _____________________________________ Builder/Homeowner Representative Signature 5110 Atlantic Ave. Raleigh, NC 27616 1-800-790-1635 | AmeriGlide.com...
Need help?
Do you have a question about the Hercules 750 and is the answer not in the manual?
Questions and answers