Select the [Print Now] icon from the toolbar.
The selected job prints.
NOTE: A newly assigned Print Now job will not interrupt an
active Print Now job. The newest Print Now job is added to the
end of the active interrupt job list. Any Print Now jobs requiring
unavailable resources (such as special media or finishing), are
ineligible and will not be scheduled as a Print Now job until the
resource is made available.
NOTE:
Printing a proof job
This feature allows you to print a proof copy of a multi-copy job
while eliminating the need to resubmit the job to print once the
content and/or layout have been verified.
All job attributes apply to Proof jobs except the quantity. The
default print quantity for Proof jobs is 1 (one); however, the default
can be modified in system preferences by the System
Administrator.
NOTE: You can also set a queue to automatically print proof
copies of each job submitted to the queue.The current job is
interrupted at the end of a page if printing has not completed or on
a set boundary if the interrupted job is finished. Processing for
non-Print Now jobs in the queue is suspended until all Print Now
jobs are printed.
To proof one or more jobs:
1. Open Job Manager and select the Current tab.
2. In the Active or Inactive Jobs list select a job and perform one
of the following:
Right-click the job and choose [Proof] from the menu.
From the Job pull-down menu select [Proof].
Select the [Proof] icon from the toolbar.
A proof of the selected job is printed. The job status changes
to "Proofed," and it is placed in the Inactive Jobs list.
3. Once the proof is verified, you can release the remainder of
the job to print.
NOTE: A newly assigned Proof job will not interrupt a printing
Proof job. The newest Proof job is placed in the queue at the
end of the active Proof jobs. Any Proof jobs requiring
unavailable resources (such as special media or finishing), are
ineligible and will not be scheduled as an interrupt Proof job
until the resource is made available.
Saving a job