ESY Sunhome ESYSUNHOME 5KWH+ User Manual & Installation Manual

Ess battery system

Advertisement

Quick Links

ESYSUNHOME ESS BATTERY SYSTEM
User Guide & Installation Manual
ESY SUNHOME CO., LTD
Website﹕ www.esysunhome.com
Phone: +86 (0)755 8522 9087
Address: 101, Building 6, No. 5-2, Inner Ring Road, Shanxia Community,
Pinghu Street, Longgang District, Shenzhen, China.
Made in China
ESY SUNHOME CO., LTD

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ESYSUNHOME 5KWH+ and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for ESY Sunhome ESYSUNHOME 5KWH+

  • Page 1 ESYSUNHOME ESS BATTERY SYSTEM User Guide & Installation Manual ESY SUNHOME CO., LTD Website﹕ www.esysunhome.com Phone: +86 (0)755 8522 9087 Address: 101, Building 6, No. 5-2, Inner Ring Road, Shanxia Community, Pinghu Street, Longgang District, Shenzhen, China. Made in China...
  • Page 2: Table Of Contents

    PV home energy storage products, resulting in the official 8.2.2 BMS-STM8S-TI functions operation 1.3 Important Safety Information launch of the HM6 series storage system products on January 14th, 2023. ESY SUNHOME now has 8.3 Maintenance Instructions branches in Sydney, Australia and Munich, Germany, with a long-term objective of becoming a 2 Safety Precautions for Use...
  • Page 3: Precautions

    Keep ignition sources like sparks, flames, and smoking materials away from the battery. The personnel to be dispatched for installing or maintaining ESY SUNHOME’s devices are fully trained and knowledgeable of all safety precautions and capable of performing all operations correctly.
  • Page 4: Nameplate Identification

    600±0.5 mm 3 Safe Transportation and Storage 3.1 Battery Transportation When transporting the battery, it must be packed in the original packaging to ensure the safety 220±0.5 mm of the equipment during transportation. Upon receiving the goods, please inspect the external packaging of the battery and then open the box for a comprehensive inspection.
  • Page 5: Port Description

    Port Description Schematic diagram of top port arrangement for battery Schematic diagram of bottom port arrangement for battery Mark Purpose Mark Purpose PACK- Battery cathode Reserved interface Mark Purpose Mark Purpose PACK- Battery cathode Ground wire PACK- Battery cathode Reserved interface PACK- Battery cathode CAN-H2...
  • Page 6: No Ac Connection On Battery

    4.4 No AC connection on battery Model ESYSUNHOME 20KWH+ ESYSUNHOME 25KWH+ ESYSUNHOME 30KWH+ Number of Batteries The battery does not possess an alternating current (AC) interface; it has a direct current (DC) interface. There are three terminals labeled PACK+ and four terminals labeled PACK-. On the top and bottom of the battery, there are dedicated Battery Capacity 20.48 25.6...
  • Page 7: Preparation Before Installation

    7 Preparation Before Installation 7.2 Base of Battery Name Specifications Quantity Schematic Diagram 7.1 Packing List of Battery Name Specifications Quantity Schematic Diagram Bracket 600 mmx305 mmx44.1 mm 5KWH+ residential Battery energy storage battery Silicone, black, matte, Waterproof 110 mmx39.9 mmx9 mm connector cover (installed on the base) Fixing angle iron screws...
  • Page 8: Selection Of The Installation Environment

    7.3.3 Installation Safety Precautions 7.3.2 Selection of the Installation Environment Please select the site according to the relevant requirements. The installation and use environment of lithium batteries must comply with relevant international, national, and local standards, as well as local laws and regulations. Ensure that the battery is not accessible to children and is kept away from areas of daily work or living, including but not limited to: offices, bedrooms, living rooms, music rooms, kitchens, studies, game rooms, home theaters, sunrooms, bathrooms, laundry rooms, and attics.
  • Page 9: Selection Of Installation Locations

    7.3.4 Selection of Installation Locations 7.4 Installation 7.4.1 Location Vertical installation, without forward or backward tilting. Tools: spirit level, marker, ruler 600 mm 18 mm 18 mm 165 mm Mark and designate the left and right boundaries of Perpendicular to marking line A, use a ruler and a the selected equipment, with a distance of 600 mm laser Level to measure and draw marking line C.
  • Page 10: Drilling

    7.4.2 Drilling Tools: electric drill (bit size: 6 mm), hammer, expansion tube (6x40 mm) with screws φ Bracket mounting screws M4x8 mm >40 mm Bracket mounting screws M4x8 mm 18 mm 18 mm 165 mm Secure four screws using the screwdriver Once the installation location has been determined, tighten all screws.
  • Page 11: Stacking Of Multiple Batteries

    7.5 DC Connection Instructions 7.4.5 Stacking of Multiple Batteries Tools: ruler, screwdriver, open end wrench (7 mm), angle iron screws (M4x10 mm), angle iron (L79.5x32x25 mm), expansion tube (M6x40 mm) with screw, handlebar screws (M4x30 mm), waterproof connector cover, The battery has three PACK+ ports and four PACK- ports. There are dedicated GP38 connectors on the top and bottom gasket (SUS304) of the battery for direct connection.
  • Page 12: How To Set Up Battery Monitoring

    7.7 How to Set Up Battery Monitoring User permissions: Read only: User or inspector. These settings can be able to be viewed by the user/inspector. Read and editing: Battery manufacturers or authorized maintenance personnel. These settings can be edited by the authorized persons. The authorized persons need to enter the correct password to enable editing permission.
  • Page 13 ② General setting: set the parameters for the battery. ③ Download: update the software of battery, do some important configuration 8.3 Maintenance Instructions (Electrical Connection Maintenance and ESD Cleaning) The surroundings of the battery enclosure should be kept clean, and any debris, dust, or accumulated water on the surface of the enclosure should be cleaned.

Table of Contents