EZ-PD™ PAG2S-2P 65 W high-frequency active clamp flyback
charger and adapter solution user guide
Quick steps for demo
5
Quick steps for demo
Connect the 65-W solution board to the power meter AC terminal (which is already connected to the
1.
programmable AC supply) as in
Connect a USB PD tester or a power adapter tester (PAT) to the port and ensure that the USB PD tester gets
2.
a successful Power Delivery contract as shown in
Connect the electronic load at the PAT tester load terminal as in
3.
Select the desired voltage on PAT UI and ramp up the load on the electronic load.
4.