Escea DFS730 Information Sheet

Freestanding gas fireplace

Advertisement

DFS730 Freestanding Gas Fireplace
Information Sheet for Builders and Architects
S P E C I F I C AT I O N S
Heat Output
Gas Input
Gas Connection
Gas Type
Power Requirement
Operation
Appliance Weight

Connections

Clearance to Combustibles
Service Access Hatch
Certification
Installation Compliance
I N S TA L L AT I O N
1
Locate the freestanding console in the desired location,
complying with all clearances. Allow for an electrical outlet
within 1m. Remove the upper and lower fascia from the
console and set aside. Install the black rigid liners to the
console, run the twin flexible flue pipes and powerflue
electrical cable.
† Refer to the Escea DFS730 Flue Specification Guide
5.4 - 5.8 kw
23 MJ/hr (NG) 23 MJ/hr (ULPG/Propane)
Lower rear of fireplace - 1/2" BSPT Female
Natural Gas or Propane or ULPG
3 pin, 230V AC mains power within 1m
Thermostatic RF remote control
58kg (DF700) + 38kg (DFS Console)
Lower right of fireplace
Zero clearance from fireplace surfaces
Not Required
Complies with AS/NZS 5263.1.3
AS/NZS5601.1 and DF Series Install Manual
2
Secure the freestanding console to the floor. Install the
DF700 fireplace into the freestanding console connecting
the flue pipes, gas connections and powerflue electrical
cable. Connect power supply to wall outlet. Complete
commissioning of the fireplace and flue.
Flue System
Flue Termination Locations
Minimum Flue Length
Max. Flexible Flue Length
Max. Insulated Flexible Flue Length
Maximum Flue Length
Flue Bends Allowed
3
Fit the lower and upper fascia components back to the
console. Install the ceiling plate to cover the hole for
the flue pipes. Complete the project with any remaining
fixtures and finishes.
630427_3 DFS730 Builders and Architects Information Sheet
Power direct-vent with 100/75mm Ø
flexible and rigid PP flue pipes†
Roof or wall mounted terminations
1250mm
4m†
N/A
12m†
Max. 10 bends in any flue run

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DFS730 and is the answer not in the manual?

Questions and answers

Summary of Contents for Escea DFS730

  • Page 1 Connect power supply to wall outlet. Complete fixtures and finishes. console, run the twin flexible flue pipes and powerflue commissioning of the fireplace and flue. electrical cable. † Refer to the Escea DFS730 Flue Specification Guide 630427_3 DFS730 Builders and Architects Information Sheet...
  • Page 2 2.4m from the fireplace. No flue liners are needed When the DFS730 freestanding console is at floor level, a hearth is not required, in the roof space. The total flexible flue length is 4m, allowing both vertical and however it may be used for decorative purposes of the protection of heat-sensitive horizontal flue pathways.

Table of Contents