Commissioning

WARNING
The following procedure requires the detector cover to be removed while carrying out supply
voltage checks. Therefore, the appropriate permits to work should be sought in preparation.
Prior to carrying out any HOT WORK ensure local security and site procedures are followed.
Ensure that the associated control panel output actuation is inhibited so as to prevent false
alarms.
Caution: The following procedure should be followed carefully and only performed by
suitably trained personnel

Commissioning SafeVader

1.
Remove the detector cover. Gently remove the front panel and PCB with cover from
detector base.
2.
Configure the detector's analogue output signal and power input connections correctly
3.
Check that all electrical connections are terminated correctly
4.
Switch On the external power supply to feed the detector
5.
Using a Digital Multi Meter (DMM), check the Supply Voltage at the terminals V+ (24V)
and V- (0V), this should be a minimum supply voltage of 12VDC (Maximum supply voltage is
24VDC)
6.
Check LED status on detector main board. LED will be illuminated right after applying
power.
7.
Check the screen. It will run self check tests and report the results. All tests should end
with OK. In case of any ERROR message contact Prosense.
8.
When test completed the screen will show monitoring screen with detector information
and WARMUP message on status line. The Fault LED is lit in this period.
9.
Wait two minutes to see WARMUP message removed from status line and fault LED
gone off.
10.
Switch Off the external power to the detector.
11.
Fix the front panel and main PCB to detector base via securely locating the cables. Fix
the front panel screws.
12.
Switch on external power to the detector.
PRS-UM-SV-EN-Rev1.0-16.12.2022
Page 21 / 41