Electrical connection
20
5.3
Sliding sleeves
For more details, see the "Accessories" section.
A
5.4
Post-mounting check
Is the device undamaged (visual inspection)?
Does the measuring device meet the measuring point specifications?
For example:
• Process temperature
• Process pressure
• Ambient temperature
• Measuring range
Are the measuring point number and labeling correct (visual inspection)?
Is the device adequately protected from wet conditions and direct sunlight?
Is the device properly secured?
6
Electrical connection
6.1
Required tool
• Screwdriver for electrical connection
• Allen key for screw of cover lock
6.2
Connecting requirements
6.2.1
Cover with securing screw
The cover is locked by a securing screw in devices for use in hazardous areas with certain
explosion protection.
NOTICE
If the securing screw is not positioned correctly, the cover cannot provide secure
sealing.
‣
Open the cover: slacken the screw of the cover lock with a maximum of 2 turns so that
the screw does not fall out. Fit the cover and check the cover seal.
‣
Close the cover: screw the cover securely onto the housing, making sure that the
securing screw is positioned correctly. There should not be any gap between the cover
and housing.
16
Cover with securing screw
Liquiphant FTL51B Density
4
0.7 Nm
2 x
Endress+Hauser
A0039520