Download Print this page

Assembling The Floor Stand Kit - NEC LCD8205-FSK User Instructions

Floor stand kit for multisync lcd8205

Advertisement

-Step One
Confirm that 1/2"-13 hex-nuts are threaded onto the stem of the castors. If not,
be sure to do so. Once the hex-nuts are installed, the castors can be threaded
into the base of the Floor Stand Kit. Reminder, installation of leveling feet is
identical, except the feet need to be adjusted to ensure the stand will sit level.
-Step Two
Attach middle-section to the base. Slip the middle-section onto the positioning
cylinders. Install the four 1/2"-13 Allen head bolts, and 1/2" flat washers.

Assembling The Floor Stand Kit

Process begins with installation of castors or leveling feet.
Page 3

Advertisement

loading

This manual is also suitable for:

Lcd8205 - multisync - 82" lcd flat panel display