Table of Contents

Advertisement

Available languages

Available languages

Quick Links

 
 
 
 
 
 
 
 
 
 
Original-­Betriebsanleitung  
Original-­Instruction  Manual  
 
HOMA  Pumpenfabrik  GmbH  
Industriestr.  1  
D-­53819  Neunkirchen-­Seelscheid  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Version  06/2016  –  No.  00502012.01  
50  Hz  
Baureihe  /  Serie  
C225  
C235  
C280  
C290  
 
 
 

Advertisement

Chapters

Table of Contents
loading
Need help?

Need help?

Do you have a question about the C235 and is the answer not in the manual?

Questions and answers

Summary of Contents for Homa C235

  • Page 1                       Original-­Betriebsanleitung   Original-­Instruction  Manual     HOMA  Pumpenfabrik  GmbH   Industriestr.  1   D-­53819  Neunkirchen-­Seelscheid                            ...
  • Page 2: Table Of Contents

    Inhaltsverzeichnis     Inhalt   Seite      1.        Allgemeines   3      1.1.  Konformitätserklärung   3      1.2.  Vorwort   4      1.3.  Bestimmungsgemäße  Verwendung   4      1.4.  Urheberschutz   4    ...
  • Page 3: Allgemeines

      EG-­Konformitätserklärung  im  Sinne  der  EG-­Maschinenrichtlinie  2006/42/EG,  Anhang  II  Teil  1  A     Hersteller  Name  und  Adresse:     HOMA  Pumpenfabrik  GmbH   Industriestraße  1   53819  Neunkirchen  -­  Seelscheid     Hiermit  erklären  wir,  dass  die    ...
  • Page 4: Vorwort

    Sehr  geehrte  Kundin,  sehr  geehrter  Kunde,     wir   freuen   uns,   dass   Sie   sich   für   ein   Produkt   der   Firma   HOMA   Pumpenfabrik   GmbH   entschieden   haben.   Das  ...
  • Page 5 Produkt   darf   nur   in   technisch   einwandfreiem   Zustand   betrieben   werden.   Während   der   vereinbarten   Gewährleistungszeit   darf   die   Reparatur   des   Produktes   nur   von   der   HOMA   Pumpenfabrik   GmbH   und/oder   einer  ...
  • Page 6         HEKO  Pumpen  GmbH   Richard  Heep  Pumpen  GmbH   Rudolf  Schabmüller  GmbH     HOMA  Pumpenfabrik  GmbH       Meiendorfer  Straße  71   Ahornstr.  63   Bunsenstr.  21     Industriestr.  1   22145  Hamburg  ...
  • Page 7: Fachbegriffe

    1.6.  Fachbegriffe   In  dieser  Betriebsanleitung  werden  verschiedene  Fachbegriffe  verwendet.       Trockenlauf:   Ein  Trockenlauf  ist  auf  jeden  Fall  zu  vermeiden,  hier  läuft  die  Pumpe  mit  voller  Drehzahl,  es  ist  aber  kein  Medium   zum  Fördern  vorhanden.      ...
  • Page 8: Sicherheit

    2.  Sicherheit   Dieses   Kapitel   führt   alle   generell   gültigen   Sicherheitshinweise   und   technische   Anweisungen   auf.   Bei   Transport,   Aufstellung,   Betrieb,   Wartung,   usw.   müssen   alle   Hinweise   und   Anweisungen   beachtet   und   eingehalten   werden!   Der  ...
  • Page 9: Bedienpersonal

    2.4.  Bedienpersonal   Das   gesamte   Personal,   welches   an   der   Anlage   arbeitet,   muss   für   diese   Arbeiten   qualifiziert   sein.   Das   gesamte   Personal  muss  volljährig  sein.   Als  ...
  • Page 10: Sicherheits-­  Und  Überwachungseinrichtungen

    3.  Allgemeine  Beschreibung   3.1.  Verwendung   Pumpen   von   HOMA   fördern   verschmutztes   Wasser   und   werden   zur   Kellerentwässerung,   Trockenhaltung   von   Gruben,  Schächten  und  Kellern  eingesetzt.   Die  Pumpen  sind  nicht  zum  Fördern  von  Medien  mit  stark  abrasiven  Anteilen  (z.B.  Sand,  Kies,  Stein)  geeignet.  ...
  • Page 11: Aufbau

    3.3.  Aufbau   Das  vollüberflutbare  Aggregat  besteht  aus  dem  Motor,  dem  Pumpengehäuse  und  dem  passendem  Laufrad.  Alle   wichtigen  Bauteile  sind  großzügig  dimensioniert.                                    ...
  • Page 12: Verpackung,  Transport  Und  Lagerung

    3.3.2.  Motor   Der  Motor  besteht  aus  einem  Stator  und  der  Motorwelle  mit  dem  Läuferpaket.  Die  Leitung  für  die  Stromzufuhr  ist   für   die   maximale   mechanische   Leistung   gemäß   Kennlinie   oder   Typenschild   der   Pumpe   ausgelegt.   Die   Kabeleinführungen  ...
  • Page 13: Rücklieferung

    Gefahr  durch  umstürzen!   Das  Produkt  nie  ungesichert  abstellen.  Beim  Umfallen  des  Produktes  besteht  Verletzungsgefahr!     Muss   die   Maschine   gelagert   werden,   so   sollte   der   Lagerplatz   frei   von   Schwingungen   und   •...
  • Page 14: Aufstellung  Und  Inbetriebnahme

    5.  Aufstellung  und  Inbetriebnahme   5.1  Allgemein   Um   Schäden   an   der   Pumpe   während   der   Aufstellung   und   im   Betrieb   zu   vermeiden   sind   folgende   Punkte   zu   beachten:  ...
  • Page 15: Inbetriebnahme

        Schwimmerschaltung  zum  Zwischenkuppeln   Pumpen  ohne  Schwimmerschaltung  können  nachträglich  mit  einer  HOMA  Schwimmerschaltung  zum   Zwischenkuppeln  ausgerüstet  werden.  Der  Elektroanschluss  erfolgt  indem  die  Schwimmerschaltung  zwischen   Steckdose  und  Netzstecker  der  Pumpen  zwischengekuppelt  wird.  Bei  nachträglicher  Installation  das  ...
  • Page 16: Elektrik

    Pumpen   mit   230   V/1Ph-­Motoren   sind   bei   Auslieferung   mit   einem   Schaltgerät   mit   Motorschutzschalter,   Anlaufkondensator   und   Betriebskondensator   ausgestattet.   Diese   HOMA-­Schaltgeräte   sind   auch   als   Zubehör  ...
  • Page 17: Instandhaltung

    6.  Instandhaltung   6.1.  Allgemein   Die  Pumpe  sowie  die  gesamte  Anlage  müssen  in  regelmäßigen  Abständen  überprüft  und  gewartet  werden.  Der   Zeitraum   für   die   Wartung   wird   vom   Hersteller   festgelegt   und   gilt   für   die   allgemeinen   Einsatzbedingungen.   Bei   aggressiven  und/oder  abrasiven  Fördermedien  muss  Rücksprache  mit  dem  Hersteller  gehalten  werden,  da  sich  in  ...
  • Page 18: Außerbetriebnahme

    7.  Außerbetriebnahme     7.1. Vorübergehende  Außerbetriebnahme   Bei  dieser  Art  von  Abschaltung  bleibt  die  Maschine  eingebaut  und  wird  nicht  vom  Stromnetz  getrennt.  Bei  einer   vorübergehenden  Außerbetriebnahme  muss  die  Pumpe  komplett  eingetaucht  bleiben,  damit  diese  vor  Frost  und   Eis  ...
  • Page 19: Störungssuche  Und  -­Behebung

    8.  Störungssuche  und  -­behebung   Um  Sach-­  und  Personenschäden  bei  der  Beseitigung  von  Störungen  an  der  Maschine  zu  vermeiden,   sind  folgende  Punkte  unbedingt  zu  beachten:   Beseitigen   Sie   eine   Störung   nur   dann,   wenn   Sie   über   qualifiziertes   Personal   verfügen,   d.h.   die   •...
  • Page 20   Ursache   Abhilfe   Maschine  läuft  im  unzulässigen  Betriebsbereich   Betriebsdaten  der  Maschine  prüfen  und  ggf.  korrigieren   und/oder  Betriebsverhältnisse  anpassen   Saugstutzen,  -­sieb  und/oder  Laufrad/Propeller   Saugstutzen,  -­sieb  und/oder  Laufrad/Propeller  reinigen   verstopft   Laufrad  schwergängig   Maschine  abschalten,  gegen  Wiedereinschalten  sichern,   Laufrad  gangbar  machen  ...
  • Page 21 Contents     Contents   Page      1.        General  Information   22      1.1.  Declaration  of  Conformity   22      1.2.  Preface   23      1.3.  Proper  use   23      1.4.  Copyright   23  ...
  • Page 22: General  Information

    EC  Declaration  of  conformity  in  line  with  the  EC  Machinery  Directive  2006/42/EEC,  Appendix  II  Part  1  A     Manufacturer  Name  and  Address:     HOMA  Pumpenfabrik  GmbH   Industriestraße  1   53819  Neunkirchen  –  Seelscheid     Germany  ...
  • Page 23: Preface

    1.3.  Proper  use   The   HOMA   products   comply   with   the   valid   safety   regulations   and   meet   the   demands   of   state-­of-­the-­art   technology.   In   the   event   of   improper   use,   there   is   a   danger   to   life   for   the   user   as   well   as   for   third   parties.  ...
  • Page 24: Technical  Terms

    Phone:              +49  2247  /  7020   Fax:                        +49  2247  /  70244   Email:                  info@homa-­pumpen.de   Homepage:  www.homapumpen.de  ...
  • Page 25: Safety

            transportable”  installation  type   With  this  installation  type  the  product  is  equipped  with  a  pedestal.  It  can  be  installed  and  operated  at  any  location.   Please  observe  the  values  for  the  maximum  submersion  depth  and  the  minimum  water  coverage,  and  remember   that  the  surfaces  of  the  product  become  very  hot.
  • Page 26: General  Safety

    Also,   various   national   standards   are   also   used   as   a   basis   for   using,   assembling   and   dismantling   the   product.   These  include  the  German  accident  prevention  regulations,  VDE  regulations,  German  Equipment  Safety  Law  etc.   The  CE  symbol  is  found  either  on  the  type  plate  or  next  to  the  type  plate.
  • Page 27: Operating  Procedure

    Beware  of  electromagnetic  radiation!   Electromagnetic  radiation  can  pose  a  fatal  risk  for  people  with  pacemakers.  Put  up  appropriate  signs  and   make  sure  anyone  affected  is  aware  of  the  danger.     2.5.2.  Ground  connection   Our   products   (machine   including   protective   devices   and   operating   position,   auxiliary   hoisting   gear)   must   always   be  grounded.
  • Page 28: General  Description

    3.  General  description   3.1.  Application   HOMA   pumps   convey   waste   water   and   are   used   for   dewatering   of   basements,   drainage   of   pits,   sewers   and   basements.  ...
  • Page 29   Nr.   1  Ph   3  Ph     1   Type  description   Type  description     2   Serial  number   Serial  number     3   Impeller  diameter   Impeller  diameter     4   Temperature  of  medium   Temperature  of  medium  ...
  • Page 30: Package,  Transport  And  Storage

    4.  Package,  Transport,  Storage   4.1.  Delivery   On  arrival,  the  delivered  items  must  be  inspected  for  damage  and  a  check  made  that  all  parts  are  present.  If  any   parts   are   damaged   or   missing,   the   transport   company   or   the   manufacturer   must   be   informed   on   the   day   of   delivery.
  • Page 31: Returning  To  The  Supplier

    After  storage  longer  than  one  year  the  oil  of  motor  and,  if  necessary  the  gear  have  to  be  changed.   •   This  is  also  necessary  if  the  product  never  had  run  (natural  deterioration  of  mineral  oil).     Before  start-­up,  the  filling  levels  (oil,  cooling  fluid  etc.)  of  the  individual  products  should  be  checked  and   topped  ...
  • Page 32: Start-­Up

    Float  switch  for  wire  rope  coupling   Pumps  without  float  switch  can  be  provided  later  with  a  HOMA  float  switch  for  wire  rope  coupling.  The  electrical   connection  is  carried  out  by  intercoupling  the  float  switch  between  the  power  socket  and  mains  plug  of  the  pumps.  ...
  • Page 33: Preparatory  Work

    Pumps  with  230  V/single  phase  motors  are  provided  with  one  switchgear  with  circuit  breaker,  start  capacitor  and   operation  condenser  on  delivery.  These  HOMA  switchgears  are  also  available  as  accessories.  When  using  other   switchgears  the  rated  current  of  the  motor  must  be  considered  when  laying  out  the  circuit  breaker.  ...
  • Page 34: Maintenance

    6.  Maintenance   6.1.  General   The  pump  as  well  as  the  entire  system  must  be  inspected  and  maintained  at  regular  intervals.  The  interval  of  the   maintenance  is  determined  by  the  manufacturer  and  applies  for  the  general  conditions  of  use.  The  manufacturer   must  ...
  • Page 35: Shutdown

    7.  Shutdown   7.1  Temporary  shutdown   For   this   type   of   shutdown,   the   machine   remains   installed   and   is   not   cut   off   from   the   electricity   supply.   For   temporary  shutdown,  the  machine  must  remain  completely  submerged  so  that  it  is  protected  from  frost  and  ice.
  • Page 36: Troubleshooting

    8.  Troubleshooting   The  following  points  must  be  taken  into  account  to  avoid  personal  and  material  damage     when  troubleshooting  machine  failures:   Correct   a   failure   only   if   you   have   qualified   staff,   i.e.   the   individual   work   must   be   carried   out   by   •...
  • Page 37 The  machinery  does  not  run  smoothly  and  makes  noises     Cause   Remedy   The  machinery  runs  in  inadmissible  operating  range   Check  the  operating  data  of  the  machinery  and  correct,  if   appropriate  and/or  adjust  the  operating  conditions   Pump  inlet,  intake  strainer  and/or  wheel/propeller  ...
  • Page 38 WEEE-Hinweis Die WEEE (Waste Electrical and Electronic Equipment)-Direktive, die am 13. Februar 2003 in die europäische Rechts- sprechung aufgenommen wurde, hat zu einem weitreichenden Umdenken bei der Entsorgung von Elektro- und Elektronikgeräten geführt. Der Zweck dieser Direktive ist es, in erster Linie WEEE, d.h. elektrischen und elektronischen Abfall, zu vermeiden und des Weiteren die Wiederverwendung, das Recycling und andere Formen der Weiterverwendung dieser Art von Müll voranzutreiben, um Abfallmengen zu verringern.
  • Page 39: Kontaminationserklärung

    Die   Instandsetzung   der   Geräte/Geräteteile   wird   nur   durchgeführt,   wenn   eine   korrekt   und   vollständig   ausgefüllte   Kontaminationserklärung  vorliegt.  Sonst  kommt  es  zu  Verzögerungen  der  Arbeiten.       RÜCKFAX  an  HOMA  Pumpenfabrik  GmbH:…  +49  (0)  2247  702  -­  44         Gerätedaten:  ...
  • Page 40: Declaration  Of  Contamination

      The  repair  if  the  instruments  can  only  be  accomplished  if  this  document  is  filled  out  completely  and  accurately.       ANSWER  by  FAX:  HOMA  Pumpenfabrik  GmbH:…  +49  (0)  2247  702  -­  44         Pump  data:  ...

This manual is also suitable for:

C225C280C290

Table of Contents