Page 13
Power Plant Wind Power Plant PV Power Plant EV Charging Station Discharge Charge PCS unit Lithium battery unit Turnkey station Power Load ...
Page 15
Firefighting Lithium battery system bank conditioners×14 Lithium battery unit...
Page 16
System Switch Gear*2 SC1000KU*2 PCS unit 12192mm 480inch 2438mm 96.0inch...
Page 33
Aluminium Aluminium side Copper side (Connected to copper (Connected to aluminium bus bar) cable terminal) Copper bus bar Copper-aluminium transition sheet Aluminium connection terminal...
Page 36
× On site, all cables connected to the external devices...
Page 37
Connect to the positive Connect to the pole of SSG negative pole of SSG Front side...
Page 38
Copper bar Flat washer Flat washer Spring washer Spring washer Bolt Cable lug Connect to the negative pole of BCP Connect to the positive pole of BCP...
Page 39
Copper bar Flat washer Flat washer Spring washer Spring washer Bolt Cable lug ...
Page 52
After the Turnkey Station is officially put into operation, do not place any combustible or flammable materials within in at least 5m around the installation site. The minimum electrical clearance around the Turnkey Station must comply with the national/local related standards.
Need help?
Do you have a question about the ST4200KWH-2000 and is the answer not in the manual?
Questions and answers