Operator Installation - Inward Opening; New Site Installations; Key Terms In This Section; Operator Installation - Outward Opening - CENTURION SYSTEMS VANTAGE 400 SMART Installation Manual

Swing gate operators
Table of Contents

Advertisement

SECTION 6
6. OPERATOR INSTALLATION - INWARD-OPENING

6.1. New Site Installations

Figure 17 illustrates the values corresponding to the Inward-Opening Gate Installation
Tables.
Wall
A
E
B
VANTAGE SMART
operator
The length of the wall bracket should equal B minus E. When looking at
the example above, the wall bracket should measure
240mm (B) - 160mm (E) = 80mm (wall bracket length)
Ensure that the gate mass does not exceed the specifications on
Section 2.3. "Allowable Gate Massed".
6.2. Key terms used in this section
6.2.1. E-Value
1
The distance from the centre of the gate hinge to the edge of the pillar
6.2.2. A-Value
2
The horizontal distance from the Wall Bracket/pivot pin to the center of the gate hinge
6.2.3. B-Value
2
The vertical distance from the Wall Bracket/pivot pin to the center of the gate hinge
1. Refer to Figure 17 Above.
2. Seen from top of pillar.
Step 1
Measure the E-Value and ensure that it does not exceed the values shown in Table 9.
Using Table 10 - Table 14 for the VANTAGE 400 SMART or Table 17 - Table 18 for
the VANTAGE 500 SMART, along with the E-Value limitation, choose the relevant A
& B values for the installation that are as close as possible to the optimum installation
position as possible.
FIGURE 17. BRACKET POSITION - INWARD-OPENING GATE
page 24
OPERATOR INSTALLATION - INWARD-OPENING
Gate in closed position
.
1
.
1
.
1
www.centsys.com

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VANTAGE 400 SMART and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Vantage 500 smart

Table of Contents