Download Print this page

Part 3: Installation - PerkinElmer MEIZHENG BMZ6000 Operation Manual

Strip reader

Advertisement

3.1 Unpack Instrument
Carefully unpack the instrument, removing it from its plastic bag. Report any damage
to your freight carrier at once. The box will also contain the Operator's Manual, a warranty
card, a power cord, a USB cable, four blank cassettes.
NOTE: Retain the original packing material for future use in the event that the instru-
ment is shipped to another location or returned for service.
Unpacking Checklist
Quantity
1
1
1
1
1
4
Instrument Mounting and Use
Place the instrument on a flat working surface capable of safely supporting the weight
of the instrument. Excessive vibration during reading may cause poor repeatability; thus,
a sturdy working surface is required. A clearance of at least 8cm around the instrument is
required to assure optimal ventilation.
Power Switch Position
When installing the power cord the unit should be turned off. Look at the rear panel of
the instrument to check that the power switch is in the OFF position. A diagram of the rear
panel can be found in the Section Parts and Controls.
Safety Grounding
Do not alter or defeat the safety grounding methods provided. To avoid the risk of elec-
tric shock, the third prong of the AC power plug must be connected to conductive parts
internal to the equipment.
Assure Power Availability
The circuit used should be substantially free of large voltage transients (Kilovolt amp
loads) such as large pumps, large centrifuges, refrigerators and freezers, air condition-
ers, large autoclaves, ovens, and dryers. The instrument may fail to operate normally if the
power supply is interrupted. If this occurs, turn the instrument off for a moment. When the
instrument is turned back on, it will resume normal operation.

Part 3: Installation

Description
Warranty card
Operator's Manual
Power cord
USB cable (option)
Reader
Blank cassette
4

Advertisement

loading

Related Products for PerkinElmer MEIZHENG BMZ6000