Haulotte BilJax Rolling Tower Assembly Instructions Manual
Haulotte BilJax Rolling Tower Assembly Instructions Manual

Haulotte BilJax Rolling Tower Assembly Instructions Manual

Scaffold tower rolling or stationary

Advertisement

Quick Links

SCAFFOLD TOWER
Rolling or Stationary
Assembly Instructions
All Drawings Are For Illustration Only.
P/N : LL-204-11
Last Revision: March 2023

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BilJax Rolling Tower and is the answer not in the manual?

Questions and answers

Summary of Contents for Haulotte BilJax Rolling Tower

  • Page 1 SCAFFOLD TOWER Rolling or Stationary Assembly Instructions All Drawings Are For Illustration Only. P/N : LL-204-11 Last Revision: March 2023...
  • Page 2 TOWER INFORMATION A Rolling Tower should only be used on solid, level and clear floor areas. Do not use on soil or unlevel surfaces. Check for overhead obstructions which may interfere with the tower. WARNING Metal conducts electricity. Do not use this equipment in areas where contact may be made with power lines or other live electrical circuits.
  • Page 3 SCAFFOLD TOWER PARTS Side Panel Walkboard REMOVE ALL BURRS, SHARP EDGES AND CORNERS. REVISION E.C.O. 'S WEIGHT lbs. FINISH UNLESS OTHERWISE SPECIFIED MATERIAL SPECIFICATION THE FOLLOWING APPLY: *DIMENSIONS ARE IN INCHES. *TOLERANCES ARE AS FOLLOWS End Panel FRACTION DECIMALS ANGLES +/- 1/32"...
  • Page 4 STEP 1 - Preparation Before starting scaffold erection, check all parts for damage, making sure that they are in proper working order. Any part that does not look to be in good working condition or is damaged in any way should not be used.
  • Page 5 STEP 4 - Cat-A-Corner squaring brace Install cat-a-corner squaring brace at the base, below the bottom ledger on the frame by engaging sliding lock with hammer. A cat-a-corner brace should be installed at the base and every additional 20’ of height. STEP 5 - Outriggers Determine tower height required to complete the job.
  • Page 6 STEP 6 - Adding frame sections Place walkboards on the top ledger of the frame. Then, secure in place by engaging the wind locks on each walkboard at both ends (Fig. 9). Full decking should be installed before assembling the next tier, and then moved up as each tier is completed.
  • Page 7 STEP 7 - Guardrailing Upon completion of tower to desired height, install walkboards to fully deck platform work area. Secure walkboards in place by engaging windlocks. Then, hoist end guard panels to the top level and place on frames (Fig. 11). Secure in place with pig tail pins. Next, install side guard panels by connecting them to the end guard panels, and secure in place with frame brace locks (Fig.
  • Page 8 SCAFFOLD TOWER Assembly Instructions 125 Taylor Parkway Archbold, OH 43502 Phone: 419.445.8915 Toll Free: 800.537.0540 Fax: 419.445.0367 biljax.com P/N : LL-204-11 Last Revision: March 2023 ©2023 BilJax, Inc.