Page 1
THE TNT-4 AIR REFERENCE TURNTABLE SETUP AND INSTRUCTION MANUAL VPI INDUSTRIES INC., 77 CLIFFWOOD AVE #3B, CLIFFWOOD N.J. 07721 PHONE: 732-583-6895, FAX: 732-946-8578 www.vpiindustries.com...
Page 2
HOW TO SET UP YOUR TNT 4 • The most important thing you can do for your new TNT 4 is to place it on a level surface. It cannot be stressed enough that a level base for the TNT will make set up much easier.
Page 3
You now have the Main Chassis sitting on the 4 feet. This is a good time to • make sure that the table is positioned correctly. If it must be moved slightly or centered on its stand, do it slowly. Now, peel off the paper on the top of the main chassis.
Page 4
• If the belt does not run level between the platter and the flywheel, readjust the corner leveling legs. If you turn them all one turn at a time, you will not change the level of the TNT, but you will move the entire unit up and down. This is not very critical.
Page 5
• You must mail in your warrantee card. If your card is not received within 30 days of purchase, you are jeopardizing your warrantee. The motor and bearings of the TNT 4 are warranted for 5 years. There is nothing else that can fail on your TNT except the belts, which should be changed every year.
Need help?
Do you have a question about the TNT-4 AIR and is the answer not in the manual?
Questions and answers