Download Print this page

Cab Installation - Curtis 1MA5100PR Installation & Owner's Manual

Mahindra 5100 cab with heater

Advertisement

STEP 1: (VEHICLE PREP)
1.1
Remove the negative battery terminal with the cam
lever. Remove and set aside the nut from the positive
battery terminal stud. See Figure 1.1.
Tools required
10mm Wrench or Socket
1.2
Remove and set aside the toolbox and its fasteners.
See figure 1.2.
Tools required
17mm Wrench or Shallow Socket
1.3
Remove and discard the fender mounted grab handle
along with its fasteners. See Figure 1.3.
Tools required
12mm Wrench or Socket
1.4
Remove and discard the shin guards and their mounting
fasteners found on either side of the tractor at the front
of the floorboard. See Figure 1.4.
Tools required
12mm Wrench and Socket
1.5
Free up and fold forward the rear portion of the
floorboard mat. Expose the PTO lever guide plate bolts
and area around the gas pedal. See Figure 1.5. NOTE:
It may be necessary to remove the loader control
cable cover plate from the right fender to lift the
floormat.
1.6
Remove and set aside the PTO lever guide plate and
(4) bolts securing it. See Figure 1.5.
Tools required
12mm Wrench or Socket
Fig. 1.5 (Floorboard Mat, left)

CAB INSTALLATION

Fig. 1.1 (Battery Terminals)
Tool Box
Fig. 1.2 (Tool Box)
Grab Handle
Fig. 1.3 (Fender Mounted Grab Handle)
Fig. 1.4 (Shin Guard - Right Side Shown)
4 of 25
Positive Battery Terminal Stud
Shin Guard

Advertisement

loading