Agilent Technologies G5562A Safety And Installation Manual page 26

Bravo platform
Hide thumbs Also See for G5562A:
Table of Contents

Advertisement

2 Installing the Bravo Platform
Laboratory setup requirements
Electrical requirements
Environmental operating requirements
Computer requirements
18
The Bravo Platform has the following electrical requirements:
Requirement
Voltage
Frequency
Power consumption
Fuse
The Bravo Platform is for indoor use only. The following table lists the operating
specifications.
If you have integrated devices, your system might require additional cooling depending
on the number and types of integrated devices.
Operating
Pollution degree
Installation category
Temperature
Humidity
Altitude
Ensure that the computer contains the following software versions at a minimum.
Microsoft Windows 10 64-bit operating system
VWorks Automation Control software v13.1
See the VWorks software release notes for installation instructions and additional
computer requirements. You can also go to the VWorks knowledge base at
www.agilent.com/chem/askb.
G5562A, G5563A Bravo Platform Safety and Installation Guide
Value
100–240 V~
50/60 Hz
300 VA, maximum
250 V, 6.3 A, 5 mm x 20 mm, time delay
Specification
2
II
4–40 °C
10–90% RH, non-condensing
1–2000 m

Advertisement

Table of Contents
loading

This manual is also suitable for:

G5563a

Table of Contents