Page 1
ASHGROVE [8x4] USER MANUAL IMPORTANT Read carefully. Retain for future refence ASHGROVE [8x4] 01-2023...
Page 2
SAFETY & CARE GUIDELINES Take care when moving and working with the painted panels, use the supplied packaging to avoid damage to painted surfaces. When arranging the shed components for inial check, do not store the panels laid down, stand up where possible. Ensure you fully understand the use of power tools recommended for use in assembling this shed.
Page 3
Preparing your site The installaon locaon needs to be at, level and solid. Pavers or a solid material that will not be aected by weather can be used to perfectly level the shed by placing under the oor frame where required, make sure all members are supported.
Page 4
SHED COMPONENTS Carefully unpack all the items from shipping carton. Layout in a clean and safe area. Please check you have all compo- nents and they have no defects before proceeding. Door Assembly Door Assy, Door pre assembled WALL — BOTTOM PLATE [26] FS295T2, FS1130T2,...
Page 5
WALL - PANELS P1130, Weathertex Panel 1130 x 1824 x 9.5mm, Grooved P295, Weathertex Panel 295 x 1824 x 9.5mm, Grooved ROOF—Gable Frame [44] DG421A SG1299A PS32CSK, Pine 70 x 45 x 421mm, Apex , Pine, 70 x 45 x 1299mm, Single Groove Angled cut (x4) Phillips Screw #6 x 32mm, Countersunk.
Page 6
Note: MO/SM = Monument / Surfmist FACIA [12] [12] [12] F1500, Painted Facia, 100 x 19 x 1500mm, 22.5 FB143, Painted Block 70 x 45 PS32, BS100, Bugle Baen Screw Phillips Csk Screw #6 Degree. x 143mm, Facia Spacing Block x 32mm Treated Pine, Fix 100mm Galvanized, Fix F1500 to FB145 .
Page 7
WALL CONSTRUCTION—Frame & Panel MATERIAL SELECTION - Pre-select top plate and upright components for assembly, mber is a natural material, selecng best the best side of components will help the aesthecs of the nished shed. PRE-DRILL - 3mm CP1926 [4] SG1926A [2] Drill internal webs only DG1130 [1]...
Page 8
[1x4] [1x4] [4x2] P1130x1824 FS1130 FB20 MO/SM [4x2] DG1130T2 SG1130T2 PS32CSK FB20, 4 x 2 PS32CSK, 4 x 2 18mm 2 x Single Groove Top plate [Side Wall] 2 x Double Groove Top plate [Rear Wall] CP1926 or DG1926 can be used as a gauge to ensure ideal panel height of the top plate component.
Page 9
Panel Assy CP1924 PS32CSK 2mm Gap 18mm Note: Layout Lines Construct 2 panels with Corner post on Right Rear face [as per image >.] One with a DG top Rail [for back wall] One with SG top Rail [for Side wall] ASHGROVE [8x4] 01-2023...
Page 10
Panel Assy + CP1924 + DG Top PS32CSK Panel Assy + CP1924 + SG Top Groove Top Plate Plain Top Plate ASHGROVE [8x4] 01-2023...
Page 11
DG1130 DG1217A1 PS32CSK Angle cut to TOP ASHGROVE [8x4] 01-2023...
Page 14
DG295T2 FS295T2 FB20 MO/SM P295x1824 PS32CSK PS32CSK Note: Front Panel Groove is oset. Check Orientaon before xing Top Plates. FB20 MO/SM Overall height of panels should be equal to vercal beams [1926mm]. ASHGROVE [8x4] 01-2023...
Page 15
Front Panel Assy PS32CSK PS32CSK Rear panels hidden for clarity ASHGROVE [8x4] 01-2023...
Page 26
ROOF— Half Roof assembly [2] RF1148 RF1125 CH1520 MO / SM [20] RS1400 MO / SM RS50 MO / SM BS75 RD-AS2 MO / SM BS75 [8] ASHGROVE [8x4] 01-2023...
Page 30
RD-AS2 MO / SM [7] ASHGROVE [8x4] 01-2023...
Page 31
ROOF— Securing to Shed [12] [16] RS50 MO / SM BS75 BS75 [8] per roof Align Base of Roof frame with Boom of Gable Frame ASHGROVE [8x4] 01-2023...
Page 32
ROOF— Fix Sheeng To Facia Block RS50 MO/SM [3] x [4] ASHGROVE [8x4] 01-2023...
Page 34
Ridge Cap RC1520 MO/SM RS50 MO/SM Slide ridge cap into posion. Make sure peak of ridge cap is in line with peak of fascias. Screw through ridge cap into 2 rib in from end and through into roof baen. RS50 MO/SM Sheet hidden, to show screw posion in relaon to Ridge Cap &...
Page 38
Door Furniture DS1820x90 BB100S THB [Fixings Kit] DS115x90 FB20 MO/SM FB20 MO/SM in pre drilled locaons in the Door Stops ASHGROVE [8x4] 01-2023...
Once paint is dry, seal boom and sides of panels with supplied Silicone sealant. TO REGISTER YOUR WARRANTY Thank-you for purchasing a STILLA product. To register your 10 year product warranty, please go to www.slla.com.au/warranty and complete the online form.
Page 48
SAFETY & CARE GUIDELINES Take care when liing and moving components. Flooring sheets and assembled frames require a minimum of 2 per- sons to li safely. Team liing of heavy items is recommended to avoid injury. Ensure you fully understand the use of power tools recommended for use in assembling this oor. Eye protecon should be worn when necessary, when operang power tools.
Kit Contents L750 SJ11164 Log 100x100x750mm,H4 Suitable for uneven ground. It is recommended that the posts Single Joist 140x38x1707mm are concreted 400-500mm in the ground. DJ1164 EP1200 Double Joist 140x38x1707mm End Plate [Drilled] 140x38x1200mm YT505339 YT1798339 Floorboard 1798 x 339mm Floorboard 505 x 339mm.
Page 51
Assemble Sub Frames [4] Qty listed per Frame [Qty] DJ1164 EP1200 [18] BS100 SJ1164 Assemble Frames: Assemble individual frames rst. Screw through predrilled holes in End Plate (EP) into Single and Dou- ble Joists DJ & SJ) using 100mm baen screws (100BS). Assemble the 4 frames. The frames are used to mark out the post locaons for the oor.
Page 54
Quar- Floor Nogs [F350] are ideal for use as Joist spacer. Sub Frame [2] 8x4 Floor V5—2022...
Page 55
Posion 1st frame Qty listed per Frame [Qty] L750 [16] BS100 Sub. Frame Lay Frame in installaon locaon. Mark inside of frame posions, on ground. [Red doed circle on diagram below]. Remove material to achieve level frame It is recommended that the posts are concreted 400-500mm in the ground. Note: Double Joist (DJ ) should be orientated to the outside of the Floor Frame Structure.
Page 56
Secure Posts to Frame: Predrill [post] screw posion prior to ng screws, four per post. Stagger the alignment of the Screw to avoid interference of the screws Posts and xings arrangement. NOTE: L750 sits under DJ extension 8x4 Floor V5—2022...
Page 57
Levelling and lling in: Once posts are ed and secured, move frame to prepared locaon, level the posts and frames. A level frame is essenal Concrete / Backll each post into locaon, Check and adjust level and square before concrete sets up / Tamping in. 8x4 Floor V5—2022...
Page 58
Posion 2nd frame Sub Frame L750 BS65 BS100 Note: DJ’s to outside edge of frame assembly. Lay Frame in installaon locaon. Mark inside of frame posions, on ground. [Red doed circle on diagram above]. Remove sucient material to achieve level frame 8x4 Floor V5—2022...
Page 60
Floor Nogs [12] FN350 BS100 Flooring Long length runs this way >> [4] BS100 per Nog. Fixing the top of Nog ush with top of the frame will assist with oor level. Final check for frame/s level should be made before Flooring is ed. Please ensure posts and frames are level before nalizing Concreng or Tamping in of posts.
Page 62
Note: There are crosses printed on the Floorboard surface. These are used for manu- facturing control and not alignment points for xings. PS50CSK—[3] per Joist PS50CSK—[ 2] covering Nogs 8x4 Floor V5—2022...
Page 67
TO REGISTER YOUR WARRANTY Thank-you for purchasing a STILLA product. To register your 10 year product warranty, please go to www.slla.com.au/warranty and com- plete the online form. We recommend that you complete this step once you have nished installing your product.
Need help?
Do you have a question about the ASHGROVE 8x4 and is the answer not in the manual?
Questions and answers