Download Print this page

Great Canadian Systems IQ 2000 P Operation Manual

Newco iq2000p: operation manual

Advertisement

Quick Links

Manual PN 105193
Issued 0299
IQ-D
OPERATION MANUAL
Installation, Setup and
Operating Instructions.
Troubleshooting Guide.
Wiring Diagram.
GREAT CANADIAN SYSTEMS, INC.
IQ 2000 P
IQ-LD
1-800-267-3555

Advertisement

loading

Summary of Contents for Great Canadian Systems IQ 2000 P

  • Page 1 Manual PN 105193 Issued 0299 IQ-D OPERATION MANUAL Installation, Setup and Operating Instructions. Troubleshooting Guide. Wiring Diagram. GREAT CANADIAN SYSTEMS, INC. IQ 2000 P IQ-LD 1-800-267-3555...
  • Page 2: Plumber's Installation Instructions

    Installation Instructions WARNING: - Read and follow installation / setup instructions before plugging or wiring in machine to electrical circuit. Warranty will be void if machine is connected to any voltage other than that specified on the name plate. PLUMBER'S INSTALLATION INSTRUCTIONS CAUTION: Power to brewer must be OFF before proceeding with plumbing installation.
  • Page 3 Initial Setup Instructions Once the brewer tank has been filled the brew time and temperature may be checked and adjusted as required. Place a suitable decanter in place below the brew basket to catch water. The IQ features a dump valve system so brewing begins immediately when the Brew switch is depressed, providing the water level in the tank is up to the upper water probe.
  • Page 4 Program and Service Mode Functions Programming is done through the 4 hidden buttons located on the brewer faceplate under the display. Prior to accessing the program or service mode you will need to attach a service template to the faceplate of the unit in order to locate the buttons.
  • Page 5 initiated by depressing the hidden brew button labeled in fig 1, page 2 as HALF BREW. If this feature is desired use the Select button to choose "Yes". Select "No" to disable Brew #2. If you answered yes to the previous option you will be asked to set the brew time Brew Time #2 for this function.
  • Page 6 Service Options and Troubleshooting Table 2 - Summary of Service Mode Options/Messages Message Service Function/Message Fill Tank Press Brw1 Press BREW key to fill tank when displayed. No maximum run time. Cycles Since Service Depress '-' and '+' key to clear. Total Cycles Information only.
  • Page 7 heavily you may need to restrict the flow rate out of the faucet. Note: The maximum run time for the fill solenoid is 5 minutes. This error occurs when the water level probe senses water and the heater safety Error Messages probe does not.
  • Page 8 The common solutions are either incorporating a pressure regulator or a water arrestor in the incoming water line before the brewer. Newco also has an optional adjustable flow valve called the PDS valve. These devices will reduce the noise level .
  • Page 9 This message will display momentarily after the completion of the brew cycle. Time Coffee Ready Remaining will display only if it has been enabled. Time Remaining 0:00 This message will display for 5 seconds and an audible signal will sound to alert Brew Cycle Canceled the user that the brew cycle has been terminated prematurely when the cycle is Time Remaining...
  • Page 10 Delete - This will erase the character at the cursor position and pull all characters following to the left to fill its space. Backspace - This will erase the character to the left of the cursor while moving all characters (from the cursor to the right) to the left to fill the deleted characters space.

This manual is also suitable for:

Iq-dIq-ld